Impex MD-PWR-20 manual Stopper of the Cable must be underneath the Frame

Page 10

STEP 4 (See Diagram 4)

A.)

Attach the 100” Upper Cable (#42) to the opening on the front of Upper Frame (#9).

 

Attach a Pulley (#57) to the opening. Secure it with one M10 x 2 ½” Allen Bolt (#75),

 

two Ø 1” x 5/8” Pulley Bushings (#62), and one M10 Aircraft Nut (#86). Note: The ball

 

stopper of the Cable must be underneath the Frame.

B.)

Draw the cable over the Pulley along the Upper Frame toward back to the other

 

opening on the Upper Frame.

C.)

Attach a Pulley to the opening. Secure it with one M10 x M10 x 2 ½” Allen Bolt (#75),

 

two Ø 1” x ½” Pulley Bushings (#61), and one M10 Aircraft Nut (#86).

D.)

Draw the Cable around the Pulley then downward. Attach a Pulley to the top holes on

 

the two Double Floating Pulley Brackets (#41). Secure the Pulley with one M10 x 1 ¾”

 

Allen Bolt (#77), two Ø ¾” Washers (#84), and one M10 Aircraft Nut (#86).

E.)

Draw the Cable around the Pulley then upward to the opening on the Rear Vertical

 

Frame (#6). Attach a Pulley to the opening. Secure it with one M10 x 2 3/8” Allen Bolt

 

(#76), two Ø1” x ½” Pulley Bushings (#61), and one M10 Aircraft Nut (#86).

F.)

Draw the Cable around the Pulley then down to the bracket on the Sliding Weight Post

 

(#10). Secure the Cable with one M10 x ¾” Allen Bolt (#79) and one Ø ¾” Washer

 

(#84).

G.)

Attach the 123” Lower Cable (#43) to the opening on the bottom of Front Vertical

 

Frame (#8). Attach a Pulley to the opening. Secure it with one M10 x 2 ½” Allen Bolt

 

(#75), two Ø 1” x 5/8” Pulley Bushings (#62), and one M10 Aircraft Nut (#86).

H.)

Draw the Cable around the Pulley then upward to the Double Floating Pulley Brackets.

 

Attach a Pulley to the Brackets. Secure it with one M10 x 1 ¾” Allen Bolt (#77), two Ø

 

¾” Washers (#84), and one M10 Aircraft Nut (#86).

I.)

Draw the Cable around the Pulley then down to the open bracket on the base of Rear

 

Vertical Frame. Secure the Cable to the bracket with one M10 x 1” Allen Bolt (#78),

 

two Ø ¾” Washers (#84), and one M10 Aircraft Nut (#86).

J.)

Adjust the tension of the Cable system by adjusting the Pulley position on the Double

 

Floating Pulley Brackets. If the Cable is too loose, move up the Pulley one hole. If the

 

cable is too tight, move down the Pulley one hole.

K.)

Connect the Lat Bar (#15) to the Upper Cable with two Hooks (#88) and one Short

 

Chain (#89).

L.)

Connect the Shiver Bar (#16) to the Lower Cable with two Hooks (#88) and one Short

 

Chain (#89).

M.) Replace the Shiver Bar by Ankle Strap (#92) for various exercises.

9

Image 10
Contents Olympic Cage Toll-Free Customer Service Number Mon. Fri a.m. 5 p.m. PST Important Safety Notice Page Hardware Pack Hardware Pack Assembly Instruction See DiagramSecurely tighten all Nuts and Bolts installed Procedure B & C Stopper of the Cable must be underneath the Frame Diagram Securely tighten all Nuts and Bolts installed Securely tighten all Nuts and Bolts See Diagram Diagram Rack Exploded Diagram Page Parts List ’tyImpex INC Info@impex-fitness.com