Impex MD-PWR-20 manual Securely tighten all Nuts and Bolts installed

Page 8

STEP 2 (See Diagram 2)

A.) Attach the Front Vertical Frame (#8) to the bracket on Rear Stabilizer (#7). Secure it with two M10 x 5/8” Allen Bolts (#80) and two Ø ¾” Washers (#84).

B.) Attach Cross Brace (#2) to the Left & Right Support (#4 & #5). Secure each of the Cross Brace with two M10 x 3 1/8” Carriage Bolts (#69), one 5 1/8” x 1 5/8” Brackets (#38), two Ø ¾” Washers (#84), and two M10 Aircraft Nuts (#86).

C.) Attach the Rear Vertical Frame (#6) onto the bracket on Front Vertical Frame. Secure them with two M10 x 5/8” Allen Bolts (#80) and two Ø ¾” Washers (#84).

D.) Attach the Rear Vertical Frame (#6) to the Cross Brace. Secure them with two M10 x 2 3/8” Carriage Bolts (#71), one 4 3/8” x 2 3/8” Bracket (#39), two Ø ¾” Washers (#84), and two M10 Aircraft Nuts (#86).

E.) Securely tighten all Nuts and Bolts installed in Step-1 and Step-2.

F.) Insert two Weight Posts (#21) into the holes on Left & Right Support. Secure each Wright Post with one M10 x 5/8” Allen Bolts (#80) and Ø ¾” Washer.

G.) Slide two Olympic Sleeves (#65) onto the Posts. Attach a Spring Clip (#44) onto each Sleeve.

7

Image 8
Contents Olympic Cage Toll-Free Customer Service Number Mon. Fri a.m. 5 p.m. PST Important Safety Notice Page Hardware Pack Hardware Pack Assembly Instruction See DiagramSecurely tighten all Nuts and Bolts installed Procedure B & C Stopper of the Cable must be underneath the Frame Diagram Securely tighten all Nuts and Bolts installed Securely tighten all Nuts and Bolts See Diagram Diagram Rack Exploded Diagram Page Parts List ’tyImpex INC Info@impex-fitness.com