Impex MD-PWR-20 manual Procedure B & C

Page 9

STEP 3 (See Diagram 3)

A.) Slide the Sliding Weight Post (#10) onto the Rear Vertical Frame (#6) from top. Make sure the triangular cable connecting bracket faces up.

B.) Insert the open bracket on the Upper Frame (#9) into top of the Front Vertical Frame (#8). Secure them with two M10 x 5/8” Allen Bolts (#80), and two Ø 3/4” Washers (#84). Do not tighten the Bolts yet.

C.) Attach the rear of Upper Frame to the Rear Vertical Frame. Secure them together with two M10 x 2 3/8” Allen Bolts (#76) and two Ø ¾” Washers (#84). Securely tighten all Bolts in

Procedure B & C.

D.) Slide two Olympic Sleeves (#65) onto the posts on Sliding Weight Post. Attach a Spring Clip (#44) onto each Sleeve.

8

Image 9
Contents Olympic Cage Toll-Free Customer Service Number Mon. Fri a.m. 5 p.m. PST Important Safety Notice Page Hardware Pack Hardware Pack See Diagram Assembly InstructionSecurely tighten all Nuts and Bolts installed Procedure B & C Stopper of the Cable must be underneath the Frame Diagram Securely tighten all Nuts and Bolts installed Securely tighten all Nuts and Bolts See Diagram Diagram Rack Exploded Diagram Page ’ty Parts ListInfo@impex-fitness.com Impex INC