STEP 6 (See Diagram 6 & Upper Cable Loop Diagram)
A.) Attach the 165” Upper Cable (#33) to the opening on the front of Upper Frame (#1). Make sure the ball stopper is underneath the Frame. Attach a Pulley (#47) to the Cable.
B.) Secure the Pulley to the opening with one M10 x 3 ½” Allen Bolt (#77), two Pulley Bushings (#49), and one M10 Aircraft Nut (#91).
C.) Draw the Cable over the Pulley along the Upper Frame towards the back of the machine to the opening in the middle of Upper Frame. Repeat Procedure B above to install a Pulley.
D.) Draw the Cable around the Pulley then back to the upper opening on the Front Press Base (#2). Attach a Pulley to the opening. Secure it with one M10 x 6 ¼” Allen Bolt (#79), two ∅ ¾” Washers (#92), and one M10 Aircraft Nut (#91).
E.) Draw the Cable around the Pulley then towards the upper opening on the Vertical Frame (#4). Repeat Procedure B above to install a Pulley.
F.) Draw the Cable around the Pulley and back to the lower opening on the Front Press Base. Repeat Procedure D above to install a Pulley.
G.) Draw the Cable around the Pulley then to the lower opening on the Vertical Frame.
| Repeat Procedure B above to install a Pulley. |
H.) | Draw the Cable underneath the Pulley then pull upward to the other opening on the |
| back of the Upper Frame. Repeat Procedure B above to install a Pulley. |
I.) | Draw the Cable around the Pulley then downward. Attach a Pulley and a |
| Cable Retainer (#93) to the top hole on the two Double Floating Pulley Brackets (#22). |
| Secure the Pulley and the |
| M10 x1¾” Allen Bolt (#83), two Ø ¾” Washers (#92), and one M10 Aircraft Nut (#91). |
| Let the Bracket hanging for now. |
J.) | Draw the Cable around the Pulley then upward to the open bracket between the two |
| Guide Rods. Repeat Procedure J above to install a Pulley. |
K.) | Draw the Cable around the Pulley then downward to the Selector Rod (#28). Securely |
| thread the Head Bolt at end of the Cable into the Selector Rod. |
15