STEP 5 (See Diagram 5 & Cable Loop Diagram)
A.) | Attach the 153” Upper Cable (#34) to the opening at the front of the Upper |
| Frame (#5). Note: The Ball Stopper on the cable should be underneath the |
| Frame. |
B.) | Attach a Pulley (#47) to the opening. Secure it with one M10 x 2 ½” Allen Bolt |
| (#74), two Ø 7/8” x 5/8” Pulley Bushings (#43), and one M10 Aircraft Nut (#82). |
C.) | Draw the Cable towards the back of the machine to the opening on the Upper |
| Frame. Attach a Pulley to the opening. Secure it with one M10 x 3” Allen Bolt |
| (#76), two Ø 7/8” x ¾” Long Pulley Bushings (#42), and one M10 Aircraft Nut |
| (#82). |
D.) | Draw the Cable around the Pulley then pull back towards the open bracket on |
| the Front Press Base (#11). |
E.) | Attach a Pulley to the bracket. Secure it with one M10 x 1 ¾” Allen Bolt (#72), |
| two Ø ¾” Washers (#80), and one M10 Aircraft Nut (#82). |
F.) | Draw the Cable around the Pulley through the hole on the Vertical Frame to the |
| open bracket on the rear of Vertical Frame (#4). Repeat Procedure E above to |
| install another Pulley. |
G.) | Draw the Cable around the Pulley then downward. Attach the Cable to in |
| between the two Double Floating Pulley Brackets (#29). Repeat Procedure E to |
| install a Pulley. Let the bracket hanging for now. |
H.) | Draw the Cable around the Pulley then pull the Cable upward to the open |
| bracket on the Top Socket Assembly (#6). |
I.) | Attach a Pulley to the bracket. Secure it with one M10 x 2” Allen Bolt (#73), one |
| |
| Nut (#82). |
J.) | Draw the Cable to the other open bracket on the Top Socket Assembly. Repeat |
| Procedure I to install another Pulley. |
K.) | Pull the Cable downward between the two Guide Rods, through a Ø 1 ¾” Rubber |
| Bumper (#52) to the Selector Rod (#28). Fully thread the bolt at the end of the |
| Cable into the top opening on the Selector Rod. |
L.) | Connect the Lat Bar (#19) to the Upper Cable with a |
15