Jumpking OR1213 manual 11.a

Page 19

10.Attach the other three Pole(16,17) in the same way. See inset drawing.

11.Lay out Top G3 Pole (18), joint each section Connector to a straight line as shown.

Assemble the remaining Top G3 Pole (18) in the same way.

Spread the Netting (20) on the trampoline bed, insert a Top G3 Pole (18) into the opening of Top Sleeve on the Netting (20). Insert the other Top G3 Pole (18) into the opposite opening of Top Sleeve on the Netting (20).

12.Joint each end of Top G3 Pole (18) by the clip of connector at each opening. The Top Sleeve of the Netting (20) become a round shape.

10

17

16

11

18

11.a

Opening

(18)

Netting(20)

Insert the pole into sleeve of the Netting(20)

12

Joint the end of each pole by Clip of Connector

Start:

Finish:

Top Sleeve

Door of Netting

19

Image 19
Contents YJ USA Corp., 3970 Lindbergh Drive Adison, TX Page Page Trained Spotter supervision is recommended Page Page Page Page Page Page Sharply Spot Page Page Page Marking Hook the V-ring Webbing Socket 11.a Attached Hanging Point Repeat this procedure with the remaining straps Stake 18BLACK