Jumpking OR1213 manual Attached Hanging Point

Page 20

Attach the first hanging point at the upper edge of the

Netting (20) with the G3 Pole (18) to the Hemisphere Cap (19)

of Top enclosure pole(17). Attach a second hanging point directly across the Netting (20) from the first hanging point.

Attach the other two hanging point halfway between the first two hanging points, so four hanging points are attached as shown.

See insert drawing for attached of G3 Pole (18): Hemisphere Cap (19) has been attached to the top of the Top enclosure pole(17).

13.Note: During steps 14 and 15, you will “tie” the lower edge of the Netting(20) to the V-rings on the bed by straps.

Please see insert drawing a, b, c, d on next page.

12.a

Hanging Point1

Hemisphere Cap(19)

Hanging Point2

 

Hanging Point3

Hanging Point4

Netting(19)

Door of Netting

Attached Hanging Point:

Hemisphere Cap

(19)G3 Pole(18)

Top enclosure pole (17)

Netting

13

20

Strap

20

Image 20
Contents YJ USA Corp., 3970 Lindbergh Drive Adison, TX Page Page Trained Spotter supervision is recommended Page Page Page Page Page Page Sharply Spot Page Page Page Marking Hook the V-ring Webbing Socket 11.a Attached Hanging Point Repeat this procedure with the remaining straps Stake 18BLACK