Huffy APSUSB1 manual Top

Page 5

IMPORTANT! WRITE MODEL NUMBER FROM BOX ONTO PAGE 1 OF THIS OWNERS MANUAL

1.

 

 

 

 

 

 

 

 

 

1

2.

 

 

 

Note

 

 

 

WARNING

GROUND SURFACE

(See Text Page)

 

 

 

 

 

 

 

 

 

• Surface du sol

 

 

 

TOP

 

(See Text Page)

 

 

 

 

 

 

 

 

 

 

 

 

18" (42.7 cm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6" (15.2 cm)

 

 

2

 

 

 

 

 

 

 

MIDDLE

 

 

 

 

 

 

 

 

 

 

 

24" (61 cm)

 

 

 

3

 

 

 

PLAYING SURFACE

 

 

BOTTOM

 

 

 

 

• Surface de jeu

3.

4.

 

5.

IMPORTANT!

6.

 

Note

(See Text Page)

 

 

 

 

 

 

 

 

 

 

(See Text Page)

 

 

 

 

 

 

 

3

 

 

Note A

 

 

 

 

 

 

 

(See Text Page)

 

 

 

 

 

 

 

Note B

6

Note A

 

 

 

 

 

(See Text Page)

(See Text Page)

 

 

 

 

 

 

 

 

 

4

 

 

 

 

 

 

 

 

1" (2.54 cm)

 

 

 

5

 

 

 

 

 

 

Note B

 

 

 

 

 

 

 

(See Text Page)

 

 

 

 

 

5

 

08/02

P/N 211969

Image 5
Contents Required Tools Materials Write in Your08/02 Parts List Hardware Identifier TOP Elevator Installation See steps Fig. a Reinforcement BAR Playing Surface For spring loaded rim 10 ft 05 m Clip ARM Clip Body NET Installation Système de poteau carré Manuel de lutilisateur Outils Necessaires ’INSTALLATIONEmpilez la section de poteau supérieure 1 sur lensemble du Carte DE Garantie Tragbares Basketball-System Benutzerhandbuch ZUR Installation Erforderliche WerkzeugeDeutsch Garantiekarte Herramientas Necesarias Para LA Instalación Manual del propietario del sistema portátil de baloncestoEspañol Tarjeta DE Garantía