Huffy SKM 5200 manual Adjusting the Height to any of the Seven Positions

Page 11

25. Apply logo label (51). Then snap cover

(37) closed.

37

51

Adjusting the Height to any of the Seven Positions

26. Insert the end of a broom handle or wooden dowel 3/4”-7/8” (19-22 mm) diameter into the release lever.

 

 

 

REGULATION RIM HEIGHT

 

 

 

IS 10 FEET (3.05M).

 

 

 

(10 fot) i NBA.

 

 

 

RELEASE LEVER

 

 

 

 

IMPORTANT!

 

 

 

 

Push up,

 

10 feet

 

 

pivot toward pole

 

(3.05m)

 

 

and lower to lock.

 

 

Push up and pivot

 

 

 

away from pole

BROOM HANDLE OR

 

 

to raise

WOODEN DOWEL

HUFFYSPORTS

 

and lower.

(not included)

 

 

P/N 205932

5/99

11

5/99

P/N

Image 11
Contents Portable Basketball System U.S.1-800-558-5234 and Canada Page TOP Middle Bottom IMPORTANT! Bounce IMPORTANT! AddDo not Over Tighten Page Assemble rim bracket 30. Tighten completely Page NON-TOXIC Antifreeze Clip IMPORTANT! Make Sure NET is HeldBy ALL Three Hooks on the NET Adjusting the Height to any of the Seven Positions Page YOU MAY have Extra Parts with this Model Parts ListThis Model YOU MAYHave Extra Parts with