STEP 8 (See Diagram 8)
A.) Attach the Power Station Arm Pads (#35) to the Right & Left Dip Support (#27 & #28). Secure each Arm Pad with two M8 x 2 ¾” Allen Bolts (#84) and two Ø 5/8” x 1” Curved Washers (#94).
B.) Attach two Vertical Handles (#13) to Right & Left Dip Support. Secure each Handle to each Support with one M10 x 1” Allen Bolt (#81) and Ø ¾” x 1 1/8” Curved Washer (#95).
C.) Insert 15 ¾” Long Foam Tube halfway through the hole on Seat Support (#5). Insert 15” Short Foam Tube (#23) halfway through the hole on Leg Developer (#7). Push four Foam Rolls (#36) onto the Tubes from each end.
D.) Attach the Foot Plate (#25) to the pivot on Base Frame (#3). Insert the Foot Plate Axle (#24) through the Foot Plate and the pivot to secure the Foot Plate to the Base Frame.
DIAGRAM 8
18