3. Attach the Front Leg (8) to the Frame (2) with two | 3 |
|
|
|
|
|
|
M8 x 43mm Bolts (39), four M8 Washers (16), |
|
|
|
| 2 |
|
|
and two M8 Locknuts (17); do not tighten the |
| 39 |
| 16 |
|
| |
Locknuts yet. |
|
| 16 |
|
| ||
|
|
|
| 16 |
|
| |
|
| 8 |
| 17 |
|
| |
|
|
|
|
|
|
| |
4. Attach the Frame (2) to the Crossbar (3) with three | 4 |
|
|
| 18 |
|
|
M8 x 55mm Bolts (18), two M8 Washers (16), and |
|
|
| 16 | 17 | ||
three M8 Locknuts (17); do not tightenthe |
|
|
|
|
| ||
Locknuts yet. |
|
|
| 2 |
|
|
|
|
|
|
|
|
| 3 | |
|
|
|
| 18 | 17 |
| |
|
|
|
|
|
| ||
5. Apply some of the included grease to an M10 x | 5 |
|
| 32 | Grease |
|
|
63mm Bolt (32). |
|
|
|
| |||
Attach the Leg Lever (4) to the Front Leg (8) with |
|
| 4 |
|
|
|
|
the M10 x 63mm Bolt (32) and an M10 Locknut |
|
|
|
| 33 |
| |
(33). Do not overtighten the Locknut; the Leg |
|
|
|
|
|
| |
Lever must pivot easily. |
|
|
|
| 8 |
|
|
|
|
|
|
|
|
| |
6. Insert a Long Pad Tube (10) into a hole in the | 6 |
|
|
|
|
|
|
Leg Lever (4). Slide two Foam Pads (23) onto the | 23 | 10 | 4 |
|
|
| |
Long Pad Tube. |
|
|
|
| |||
Attach the other Long Pad Tube (10) and two | 23 |
|
|
|
|
|
|
Foam Pads (23) in the same way. |
| 23 |
|
|
|
| |
|
|
|
| 10 |
| ||
|
|
|
|
| 23 | ||
|
|
|
|
|
|
| |
| 7 |
|
|
|
|
|
|