24.Locate the Leg Lever Cable (32), which has two ends that are the same length and a third end that is longer.
Route the longest end of the Leg Lever Cable
(32)through the hole in the Front Leg (6), and attach it inside of the hole in the Leg Lever (7) with an M10 x 60mm Bolt (63) and an M10 Nylon Locknut (76).
25.Attach a 90mm Pulley (28) inside of the hole in the Front Leg (6) with an M10 x 91mm Bolt (90), two 26mm Spacers (52), two M10 Washers (75), and an M10 Nylon Locknut (76). Be sure the
Pulley is above the Leg Lever Cable (32). Slide the two free ends of the Leg Lever Cable
(32)onto the hook welded to the bottom of the Bench Rail (5).
26.Locate the two Short Cables (33). Wrap one of the Cables around a 90mm Pulley (28). Attach the Pulley to a High Pulley Housing (21) with an M10 x 42mm Button Head Bolt (71) and an M10 Nylon Locknut (76).
Repeat this step with the other Short Cable
27.Slide the four Foam Pads (26) onto the tubes on the Front Leg (6) and the Leg Lever (7). Press four 19mm Round Inner Caps (78) into the ends of the tubes.
24 |
|
|
6 |
|
|
63 |
|
|
|
| 32 |
|
| 76 |
7 |
|
|
25 |
|
|
6 | 5 |
|
|
| |
90 |
|
|
75 |
| 32 |
|
| |
52 |
| Hook |
|
| 28 |
|
| 75 |
| 52 | 76 |
26 | 76 | |
| ||
|
| 21 |
|
| 71 |
|
| 28 |
|
| 33 |
27 | 26 |
|
78 |
|
|
| 6 |
|
|
| 26 |
26 |
|
|
| 7 | 78 |
|
| |
|
| 26 |
28.Make sure that all parts have been properly tightened. The use of the remaining parts will be explained in ADJUSTMENTS, beginning on the following page.
Before using the resistance system, pull the long cable a few times to be sure that it moves smoothly over the pulleys. If the cable does not move smoothly, find and correct the problem. IMPORTANT: If the cables are not properly installed, they may be damaged when heavy resistance is used. See the CABLE DIAGRAM on page 16 for proper cable routing.
12