19. Wrap the Long Cable (80) under a 90mm Pulley | 19 |
|
|
|
|
(28) as shown. Attach the Pulley and a Pulley |
|
|
|
| |
|
|
|
|
| |
Guard (29) to the Upright (3) with an M10 x |
|
|
|
|
|
113mm Button Head Bolt (40) and an M10 Nylon |
| 3 |
|
|
|
Locknut (76). Make sure the flat edge of the |
|
|
| 28 | |
|
|
|
| ||
Pulley Guard is on the bottom. |
|
|
|
| |
|
|
|
|
| |
| 40 |
|
|
| 76 |
|
|
|
|
| |
|
|
|
|
| 29 |
|
|
|
|
| 80 |
|
|
|
|
| Flat |
|
|
|
|
| Edge |
20. Attach a Pulley Housing (94) to the indicated “U”- | 20 |
|
|
|
|
channel on the |
|
|
|
| |
|
|
|
|
| |
(44) with an M10 x 102mm Bolt (24), two Pivot |
|
|
|
|
|
Bushings (74), and an M10 Nylon Locknut (76). |
| 44 |
|
|
|
Wrap the Long Cable (80) around a 90mm Pulley |
| 74 |
|
| 74 |
(28). Attach the Pulley inside of the Pulley |
| 94 |
|
| 76 |
Housing (94) with an M10 x 42mm Button Head | 24 |
|
| 76 | |
Bolt (71) and an M10 Nylon Locknut (76). |
|
|
| ||
|
|
|
| ||
|
| 71 |
|
|
|
|
|
|
|
| 28 |
|
|
|
|
| 80 |
21. Wrap the Long Cable (80) around a 90mm Pulley | 21 |
|
|
|
|
(28). Attach the Pulley and a Pulley Guard (29) to |
|
|
|
| |
28 |
|
|
| ||
the indicated M10 x 140mm Carriage Bolt (73) |
|
| 29 | ||
|
|
|
| ||
with an M10 Nylon Locknut (76). Make sure the |
|
|
|
| |
|
|
|
|
| |
flat edge of the Pulley Guard is on the side |
|
|
|
|
|
shown. | 80 |
|
|
| 76 |
|
|
|
| ||
|
|
|
|
| |
|
| Flat |
|
| |
22. Make sure there are no Resistance Bar (not |
| Edge |
|
| |
|
|
| 73 | ||
shown) under the |
|
|
| ||
|
|
|
|
| |
Center Resistance Bar (not shown). Have a sec- |
|
|
|
|
|
ond person pull on the Long Cable (80) to create |
|
|
|
|
|
slack in the Cable. | 22 |
|
|
|
|
Insert the end of the Long Cable (80) through the |
|
|
|
|
|
welded tube on the indicated end of the Cross |
|
|
|
| 71 |
Tube (11) and then through the remaining Swivel |
|
|
|
| |
|
| 22 | 107 | ||
Arm (22). Make sure the Cable is on the indicat- |
| Rod | |||
|
| ||||
ed side of the welded rod in the Swivel Arm. |
|
|
|
| |
80 |
|
|
|
| |
|
|
|
|
| |
Insert the Swivel Arm (22) into the welded tube |
|
|
|
| 11 |
on the Cross Tube (11). Secure the Swivel Arm |
| 28 | 76 |
| |
|
|
| |||
with an M4 x 5mm Screw (107). |
|
|
|
| |
|
|
|
|
| |
Wrap the Long Cable (80) around a 90mm Pulley |
|
|
|
|
|
(28). Attach the Pulley inside of the Swivel Arm |
|
|
|
|
|
(22) with an M10 x 42mm Button Head Bolt (71) |
|
|
|
|
|
and an M10 Nylon Locknut (76). |
|
|
|
|
|
| 11 |
|
|
|
|