Weider WESY5993.3 user manual Arm 22. Make sure the Cable is on the indicat

Page 11

19. Wrap the Long Cable (80) under a 90mm Pulley

19

 

 

 

 

(28) as shown. Attach the Pulley and a Pulley

 

 

 

 

 

 

 

 

 

Guard (29) to the Upright (3) with an M10 x

 

 

 

 

 

113mm Button Head Bolt (40) and an M10 Nylon

 

3

 

 

 

Locknut (76). Make sure the flat edge of the

 

 

 

28

 

 

 

 

Pulley Guard is on the bottom.

 

 

 

 

 

 

 

 

 

 

40

 

 

 

76

 

 

 

 

 

 

 

 

 

 

29

 

 

 

 

 

80

 

 

 

 

 

Flat

 

 

 

 

 

Edge

20. Attach a Pulley Housing (94) to the indicated “U”-

20

 

 

 

 

channel on the 10-pound Center Resistance Bar

 

 

 

 

 

 

 

 

 

(44) with an M10 x 102mm Bolt (24), two Pivot

 

 

 

 

 

Bushings (74), and an M10 Nylon Locknut (76).

 

44

 

 

 

Wrap the Long Cable (80) around a 90mm Pulley

 

74

 

 

74

(28). Attach the Pulley inside of the Pulley

 

94

 

 

76

Housing (94) with an M10 x 42mm Button Head

24

 

 

76

Bolt (71) and an M10 Nylon Locknut (76).

 

 

 

 

 

 

 

 

 

71

 

 

 

 

 

 

 

 

28

 

 

 

 

 

80

21. Wrap the Long Cable (80) around a 90mm Pulley

21

 

 

 

 

(28). Attach the Pulley and a Pulley Guard (29) to

 

 

 

 

28

 

 

 

the indicated M10 x 140mm Carriage Bolt (73)

 

 

29

 

 

 

 

with an M10 Nylon Locknut (76). Make sure the

 

 

 

 

 

 

 

 

 

flat edge of the Pulley Guard is on the side

 

 

 

 

 

shown.

80

 

 

 

76

 

 

 

 

 

 

 

 

 

 

 

Flat

 

 

22. Make sure there are no Resistance Bar (not

 

Edge

 

 

 

 

 

73

shown) under the “U”-channels on the 10-pound

 

 

 

 

 

 

 

 

Center Resistance Bar (not shown). Have a sec-

 

 

 

 

 

ond person pull on the Long Cable (80) to create

 

 

 

 

 

slack in the Cable.

22

 

 

 

 

Insert the end of the Long Cable (80) through the

 

 

 

 

 

welded tube on the indicated end of the Cross

 

 

 

 

71

Tube (11) and then through the remaining Swivel

 

 

 

 

 

 

22

107

Arm (22). Make sure the Cable is on the indicat-

 

Rod

 

 

ed side of the welded rod in the Swivel Arm.

 

 

 

 

80

 

 

 

 

 

 

 

 

 

Insert the Swivel Arm (22) into the welded tube

 

 

 

 

11

on the Cross Tube (11). Secure the Swivel Arm

 

28

76

 

 

 

 

with an M4 x 5mm Screw (107).

 

 

 

 

 

 

 

 

 

Wrap the Long Cable (80) around a 90mm Pulley

 

 

 

 

 

(28). Attach the Pulley inside of the Swivel Arm

 

 

 

 

 

(22) with an M10 x 42mm Button Head Bolt (71)

 

 

 

 

 

and an M10 Nylon Locknut (76).

 

 

 

 

 

 

11

 

 

 

 

Image 11
Contents Mon.-Fri., 6 a.m.-6 p.m. MST QUESTIONS?Model No. WESY5993.3 Serial No Call TOLL-FREETable of Contents Important Precautions Before YOU Begin Assembled DimensionsMake Things Easier for Yourself AssemblyPage Page Page Onto the tubes. Repeat with the tube on Leg Developer Do not overtighten the Locknut the Leg LeverMust be able to pivot easily Flat edge of the Pulley Guard is on the side Shown Locate the Long Cable 80. Insert one endSwivel Arm. Make sure the Cable is on the indi Ed side of the welded rod in the Swivel Arm Arm 22. Make sure the Cable is on the indicatPage Attaching the High Pulleys and LEG Lever AdjustmentsAdjusting the Seat Adjusting the Resistance Attaching the AccessoriesStoring the Resistance System Adjusting the BackrestMake sure the rings are pushed against the Tray Cable DiagramUsing the Removable Resistance Bars Adjusting the LEG DeveloperExercise Guidelines Staying Motivated Muscle ChartCooling Down Thursday Aerobic Exercise Date DateExercise Resistance Sets Reps Aerobic ExercisePart Identification Chart Page Qty Description Part LIST-Model No. WESY5993.3Exploded DRAWING-Model No. WESY5993.3 Icon Health & FITNESS, INC., 1500 S W., LOGAN, UT Ordering Replacement PartsLimited Warranty