Weider WESY5993.3 user manual Locate the Long Cable 80. Insert one end

Page 10

15. Slide the Leg Developer (19) into the Bench Rail

15

 

 

 

(5). Align the hole in the Leg Developer with a

 

 

 

 

 

 

 

hole in the Front Leg (6). Tighten the Bench Knob

 

 

 

 

(42) into the hole in the Leg Developer.

7

 

 

 

 

 

 

 

Connect the eyebolt on the Leg Lever Cable (32)

 

19

 

 

 

 

 

 

to indicated side of the Leg Lever (7) with an M8

 

 

 

 

Nylon Locknut (65).

65

 

 

 

 

Eyebolt

 

 

 

 

5

 

 

 

 

32

42

 

 

 

6

 

 

 

 

 

 

16. Locate the Long Cable (80). Insert one end of

16

 

 

 

the Cable through the welded tube on the indicat-

 

 

 

 

 

 

 

ed end of the Cross Tube (11) and then through a

 

 

80

 

Swivel Arm (22). If necessary, use the tip of a

 

 

71

screwdriver to pull the end of the Cable out of the

 

 

107

 

 

 

Swivel Arm. Make sure the Cable is on the indi-

 

11

 

cated side of the welded rod in the Swivel Arm.

 

 

 

 

Insert the Swivel Arm (22) into the welded tube

 

28

 

22

 

 

 

on the Cross Tube (11). Secure the Swivel Arm

 

 

 

 

 

 

 

with an M4 x 5mm Screw (107).

 

 

 

Rod

Wrap the Long Cable (80) around a 90mm Pulley

 

 

 

76

 

 

 

 

(28). Attach the Pulley inside of the Swivel Arm

 

 

 

 

(22) with an M10 x 42mm Button Head Bolt (71)

 

 

 

 

and an M10 Nylon Locknut (76).

 

 

 

 

17. Wrap the Long Cable (80) around a 90mm Pulley

17

Flat

 

 

 

 

 

(28). Attach the Pulley and a Pulley Guard (29) to

 

 

 

 

Edge

29

76

the indicated M10 x 140mm Carriage Bolt (73)

 

 

 

 

 

 

with an M10 Nylon Locknut (76). Make sure the

 

 

 

 

flat edge of the Pulley Guard is on the side

 

 

 

80

shown.

73

 

 

 

 

28

 

 

 

 

18. Attach a Pulley Housing (94) to the indicated “U”-

18

 

 

 

channel on the 10-pound Center Resistance Bar

 

 

 

 

 

 

 

(44) with an M10 x 102mm Button Head Bolt (24),

 

 

 

 

two Pivot Bushings (74), and an M10 Nylon

 

 

 

 

Locknut (76).

 

 

 

 

Wrap the Long Cable (80) around a 90mm Pulley

44

 

 

 

76

 

 

 

(28). Attach the Pulley inside of the Pulley

 

 

 

 

 

“U”-Channel

Housing (94) with an M10 x 42mm Button Head

74

 

 

 

 

Bolt (71) and an M10 Nylon Locknut (76).

 

76

 

71

 

 

 

 

 

 

94

 

 

 

 

 

 

 

28

74

 

 

 

 

 

 

 

80

24

 

 

 

 

 

 

 

10

 

 

 

Image 10
Contents Call TOLL-FREE QUESTIONS?Model No. WESY5993.3 Serial No Mon.-Fri., 6 a.m.-6 p.m. MSTTable of Contents Important Precautions Assembled Dimensions Before YOU BeginAssembly Make Things Easier for YourselfPage Page Page Must be able to pivot easily Do not overtighten the Locknut the Leg LeverOnto the tubes. Repeat with the tube on Leg Developer Swivel Arm. Make sure the Cable is on the indi Locate the Long Cable 80. Insert one endFlat edge of the Pulley Guard is on the side Shown Arm 22. Make sure the Cable is on the indicat Ed side of the welded rod in the Swivel ArmPage Adjusting the Seat AdjustmentsAttaching the High Pulleys and LEG Lever Attaching the Accessories Adjusting the ResistanceAdjusting the Backrest Storing the Resistance SystemAdjusting the LEG Developer Cable DiagramUsing the Removable Resistance Bars Make sure the rings are pushed against the TrayExercise Guidelines Cooling Down Muscle ChartStaying Motivated Aerobic Exercise DateExercise Resistance Sets Reps Thursday Aerobic Exercise DatePart Identification Chart Page Part LIST-Model No. WESY5993.3 Qty DescriptionExploded DRAWING-Model No. WESY5993.3 Limited Warranty Ordering Replacement PartsIcon Health & FITNESS, INC., 1500 S W., LOGAN, UT