16. Locate the Fulcrum (18) on the Lat Tower (4) (see | 16 |
| 86 |
|
|
|
the inset drawing). Slide the Tray (35) onto the |
|
|
|
| ||
|
|
|
|
| ||
|
|
|
| Edges | ||
rods on the Fulcrum. Make sure the Tray is ori- |
| 72 |
|
| ||
ented as shown in the drawing. |
|
|
| up |
| |
|
|
|
|
| ||
|
|
|
|
|
| |
Set the Resistance Bars into the Tray (35) in the |
|
|
|
|
|
|
following order: the |
|
|
|
|
| 96 |
Resistance Bar (67), the |
|
|
|
|
| |
|
|
|
|
|
| |
Resistance Bar (36), an | Rings on |
|
|
|
|
|
(95), the | this side |
|
|
|
| 44 |
|
|
|
|
| ||
Resistance Bar (96). Make sure the indicated | 4 | 35 |
|
|
| 95 |
rings are on the side shown and the arrows |
|
|
|
| 95 | |
|
|
|
|
| ||
point toward the Tray. |
| 18 |
|
| 67 | 36 |
| 18 |
|
|
| ||
Attach the Cover Plate (72), with the edges up, to |
| Rods |
|
| ||
|
|
|
|
|
| |
the Tray (35) with two M8 x 19mm Button Head | 17 |
|
|
|
|
|
Screws (86). |
|
|
|
|
| |
|
|
|
|
|
| |
17. Locate the Long Cable (80). Insert one end of |
|
|
|
| 80 | 71 |
the Cable through the welded tube on the indicat- |
|
|
|
|
| |
|
|
|
| 11 |
| |
ed end of the Cross Tube (11) and then through a |
|
|
|
| 104 | |
|
|
|
|
| ||
Swivel Arm (22). If necessary, use the tip of a |
|
|
|
|
| |
|
|
|
|
|
| |
screwdriver to pull the end of the Cable out of the |
|
|
|
|
| 22 |
Swivel Arm. Be sure the Cable is on the indicat- |
|
| 28 |
|
| |
|
|
|
|
| ||
ed side of the welded rod in the Swivel Arm. |
|
|
|
|
| |
|
|
|
|
|
| |
|
|
|
|
|
| Rod |
Insert the Swivel Arm (22) into the welded tube |
|
|
|
|
| 76 |
on the Cross Tube (11). Secure the Swivel Arm |
|
|
|
|
| |
|
|
|
|
|
| |
with an M4 x 5mm Screw (104). |
|
|
|
|
|
|
Wrap the Long Cable (80) around a 90mm Pulley |
|
|
|
|
|
|
(28). Attach the Pulley inside of the Swivel Arm | 18 |
|
|
|
|
|
(22) with an M10 x 42mm Button Head Bolt (71) |
| Flat |
|
|
| |
|
|
|
|
| ||
and an M10 Nylon Locknut (76). |
|
| Edge | 29 | 76 | |
|
|
|
|
| ||
18. Wrap the Long Cable (80) around a 90mm Pulley |
|
|
|
|
|
|
(28). Attach the Pulley and a Pulley Guard (29) to |
| 73 |
|
|
| 80 |
the indicated M10 x 140mm Carriage Bolt (73) |
|
|
|
| 28 | |
with an M10 Nylon Locknut (76). Be sure the flat |
|
|
|
|
| |
edge of the Pulley Guard is on the side shown. |
|
|
|
|
|
|
19. Attach a Pulley Housing (94) to the indicated “U”- | 19 |
|
|
|
|
|
channel on the |
|
|
|
|
| |
|
|
|
|
|
| |
(44) with an M10 x 102mm Bolt (24), two Pivot |
|
|
|
|
|
|
Bushings (74), and an M10 Nylon Locknut (76). |
|
|
|
|
|
|
Wrap the Long Cable (80) around a 90mm Pulley |
| 44 |
|
|
|
|
(28). Attach the Pulley inside of the Pulley |
|
|
|
|
| |
| 76 |
|
|
|
| |
Housing (94) with an M10 x 42mm Button Head |
|
|
|
|
| |
|
|
|
| |||
Bolt (71) and an M10 Nylon Locknut (76). |
| 74 |
|
| ||
|
|
|
|
| ||
|
|
|
| 76 |
| |
|
| 71 |
|
|
| |
|
|
| 94 |
| ||
|
|
|
|
| ||
|
| 28 | 74 |
|
|
|
|
|
|
|
|
| |
|
| 80 |
| 24 |
| |
|
|
|
|
|
| |
| 10 |
|
|
|
|
|