Before | voua |
| start- | |||||||
Check location where dryers will be |
| |||||||||
used. | Proper | installation | ls your |
| ||||||
responsibility. |
| The | dryers |
| must | not be |
| |||
installed or stored In an area where |
| |||||||||
they will be exposed to water and/or |
| |||||||||
weather. | Make sure | you | have |
|
| |||||
everything | necessary | for |
| correct |
| |||||
installation. |
|
|
|
|
|
|
|
| ||
Each of | the | equipped | with | a | ||||||
timer, selector switches and lndlcator |
| |||||||||
lights. The timers are set to provlde 45 | ||||||||||
minutes (4 pins) of drying time when |
| |||||||||
activatti |
| by | the | coin slide. | Timer |
| ||||
cams | for 3&minute |
| (6 pins) and 60- |
| ||||||
minute (3 pins) drying time are supplied | ||||||||||
with the unit in the parts bag. See |
| |||||||||
Pages 9 and 10 for timer cam |
|
| ||||||||
changing | instructions. |
|
|
|
|
| ||||
The coin | slide | mechanisms, | control | |||||||
panel lock and key, coin box, and |
| |||||||||
coin box locks and keys are not |
| |||||||||
included | and |
| are | available | from | q | ||||
usual industry |
| sources. |
|
|
| |||||
|
|
|
|
|
Protection | from weather: | Pro1 )er | |||
operation | requlres | temperah | 1res | ||
above | 45°F (7.2%). |
|
|
| |
The wiring | diagram | Is locate< | I | ||
inslde the control panel and |
| ||||
acces | panels. |
|
|
|
Important: Observe all governing codes and ordinances.
’
Dryers may be exhausted from bottom, rear, left or right side. See ‘Exhaust
reauirements’, Page 6.
9 Power supply cords
4 not supplied with unit.
Grounded | electrical |
| outlet | Is | > | |||
required. | See |
| ‘Electrical |
| ||||
requirements’, |
| Page | 3. |
| \ | |||
Location | must |
| be | large |
| .: | ||
enough to fully open dryer doors. | < | |||||||
See Page 9 for recessed area | ||||||||
II | ||||||||
requirements | and | prduct |
| \ | ||||
dimensions. |
|
|
|
|
| ‘I | ||
|
|
|
|
|
|
| ||
|
|
|
|
|
|
| .’ | |
Personal | Injury | Hazard | d:r | |||||
More fhan one person Is | ||||||||
7 |
II | Check | utilities: Proper |
Ill I | connections | |
| supply | |
| must | be available. |
.!a& to support the total /Iweight of 315 pounds per unit.
.
!LI!vel floor: Maximum floor slope dryers - 1 Inch.
required to lift. tilt, or move the | ||||
dryers | because | of their weight | ||
and size. Failure to follow these | ||||
instructions | may | result in | ||
personal |
| injury. |
|
|
| Fire Hazard |
| ||
l Do Not use or store gasoline, | ||||
paint, | tb’nners | and | other | |
flammable | materials | near | ||
dryers. |
|
|
|
|
l Never install dryers up against | ||||
draperies | or curtains | or on | ||
carpet. |
|
|
|
|
l Keep any and all Items from | ||||
falling | or | collecting | behlnd | |
the dryers. |
|
| ||
l Replace all access panels | ||||
before | operating | dryers. |
Failure to follow these instructions could result in a fire or explosion.
Tools needed for installatiton:
Phlltlps |
|
| ||
| screwdrh | er | ||
xrewdrlver | v | |||
|
|
Parts suppEed
for | installat | ion: | |||
2 | slide | protectors | 8 screw: |
| |
2 | slide | extensions | lute cams | ||
2 | bolt | and washer | |||
assemblies | |||||
4, ?+I” | good screws | ||||
|
|
|
Parts owner must supply:
1 control panel lock and key
2 coin vaults and keys E.S.D. vault mud hove projecting lock
2 coin slide m‘echanlsms (vertical 8)
j2 power cords
Parts may be ordered from Greenwald Industries. Inc. or Equlpment Systems and Devices, Inc.
l Greenwald Industti& Inc. 1340 Metropolitan Avenue Brooklyn, NY 11237 telephone (7 18) 821
fax no. (718)
1 l Equipment Systems and
I
/ Devices, Inc.
1401 Dreshertown Road
. P.O. Box 618
( Dresher PA 19025
Itelephone (215)
Page 2