Test Facilities |
|
|
|
|
|
|
|
|
|
GE Energy carries out mechanical tests on all its gas turbines. Complete turbocompressors and |
|
| FLORENCE PLANT |
|
|
|
| ||
turbogenerators, including all auxiliary equipment, can be |
|
| Stand Utilities |
|
|
|
|
| |
|
| TO INDOOR STANDS FOR GAS TURBINE TESTS 1 - 4 |
|
| Evaporating |
| |||
complying with API, ASME, VDI and ISO international standards at the Florence or Massa plants. |
|
|
| 2BVTN | STANDS 5 - 8 |
| TO INDOOR | Towers |
|
|
|
|
|
| TO OUTDOOR |
| AND OUTDOOR |
| |
|
|
|
| 2HM | STANDS 1 - 4 |
| STANDS |
|
|
|
|
|
|
|
|
|
| ||
Even complete modules can be tested at the Massa plant and than shipped without being this |
|
|
| 2BVTN | TO OUTDOOR |
|
|
|
|
|
| GAS |
|
|
| Steam generator |
|
| |
assembled because of its proximity to the Massa harbor. The test beds are equipped with |
|
| STORAGE |
|
|
|
|
|
|
|
| Air cooler | STANDS |
|
|
|
|
| |
|
|
|
| OUTDOOR |
|
|
|
|
|
computer Data Acquisition Systems capable of collecting thermodynamic and mechanical data |
|
|
|
| b |
| Condenser | STATION | MEASURING |
|
|
|
|
| e |
| |||
|
|
|
|
| a |
|
|
|
|
and computing in real time. Test facilities include a high pressure feed system for gas mixtures |
|
| COGENERATION | COMPRESSED | d |
|
|
| NATURAL |
|
| c |
|
|
| GAS | |||
(inert and flammable gases), a gas chromatograph for gas analysis, a 60 Hz generator, low and |
|
| GAS | AIR | Back | a,b,c,d Steam System | FROM | ||
|
| SYSTEM | S TAT ENS DT S | ||||||
|
|
| PLANT | SYSTEM | Pressure |
| FROM INDOOR | ||
|
|
|
|
|
|
| AND OUTDOOR | DOMESTIC | |
|
|
|
|
| I N D O O R |
| STANDS | NETWORK | |
|
|
| LIQUID | ELECTRIC |
|
|
|
| |
high pressure gas coolers, and steam and lube oil supply. The cooling towers allow |
|
|
|
|
|
|
| ||
|
|
|
|
| e | Cooling Water |
|
| |
tests up to 130 MW. GE Energy also tests complete plants on site upon customer request. |
|
|
|
|
|
|
|
|
|
FLORENCE PLANT |
|
|
|
|
|
|
|
| |
Outdoor string and load test stands |
|
|
|
|
|
| |||
4 | 3 | L |
|
|
|
|
|
|
|
|
| NTRO OOM B |
|
|
|
|
|
|
|
|
| O R | LU B E |
|
|
|
|
|
|
|
| C |
|
|
|
|
|
| |
|
|
| O I L |
| 5 |
|
|
|
|
|
|
| TA N K |
|
|
|
|
|
2 | 1 |
| C O N T R O L |
|
| R O O M | 6 |
| A | |
M O B I L E |
|
|
VA C U U M |
|
|
S Y S T E M |
|
|
I N D O O R |
|
|
T E S T |
|
|
S TA N D S | 7 a | 8 |
7 b |
Centrifugal/ axial compressor test |
| Shop electric generator + gear box |
Gas turbine test
FLORENCE PLANT |
|
|
|
|
Indoor stands for gas turbine tests |
| MASSA PLANT | ||
4 | 1 | C O N T R O L | 2 | Outdoor stands for gas turbine tests |
A | and turbogroup full load tests | |||
|
| R O O M |
|
|
L | To Test Beds |
| To Test Beds |
|
NTRO OOM B |
|
| To Test Beds | 2HM |
O R |
| a | a,d,e |
|
C |
|
| 2BVTN |
| 3 |
| 5 |
|
| Evaporating Towers |
|
|
|
| STORAGE |
|
|
|
|
|
|
|
|
|
| GAS |
| ||
| to test |
|
|
|
|
| c |
|
|
| g |
|
| beds |
|
|
|
|
| From Test Beds |
|
|
|
|
|
NATURAL GAS | D I E S E L | LU B E O I L | LU B E O I L | VA C U U M | LU B E O I L | LU B E O I L | LU B E |
|
|
|
|
|
| TA N K | C O N S O L E | C O N S O L E | S Y S T E M | C O N S O L E | C O N S O L E | O I L |
|
| MEASURING |
| f |
| A | B | C | D | TANK |
|
|
| ||||
|
|
|
| STATION |
| |||||||
|
|
|
|
|
| D I E S E L | b | CONTROL |
| |||
|
|
|
|
|
| ROOM |
|
| b |
| ||
Shop electric generator + gear box |
|
|
|
| TA N K | LU B E O I L | A |
|
|
| ||
| Shop electric motor + gear box |
| C O N S O L E |
|
|
|
|
| ||||
| Gas turbine test |
|
| Gas turbine test : | ELECTRIC |
|
|
|
|
|
| |
|
|
| Low pressure shaft | SYSTEM |
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
| MOBILE | d |
| f |
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
| VACUUM |
|
|
|
| f | f |
|
|
|
|
|
| SYSTEM |
|
|
|
|
|
|
|
| COMPRESSED |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
| AIR |
| e |
|
|
|
|
|
|
| f |
|
| ||||||
|
| SYSTEM |
|
|
|
|
|
|
|
|
| CONTROL |
|
|
|
|
| |||
|
| LIQUID |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
| GAS |
|
|
|
|
|
|
|
|
| ROOM |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| B |
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||||
| Centrifugal / axial compressor test | Hydraulic dynamometer |
|
|
|
|
|
|
|
|
| |||||||||
|
| Gas turbine test |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
25 GE Energy Gas Turbines