Buhler 595 manual Pre-delivery Check List

Page 5

Pre-delivery Check List

Before delivering this equipment please complete the following check list.

1.The loader has been installed using the appropriate mounting kit for the tractor and loader.

2.The hydraulic system installed is appropriate for the tractor and loader

3.The loader is properly installed.

4.All bolts are tightened to the torque specifications shown in the torque chart.

5.All safety decals are readable.

6.The loader has been tested and operates properly.

7.The operator’s manual has been delivered to the owner who has been instructed on the safe and proper use of the loader.

Dealer’s Signature_________________________________________________

This check list is to remain in this Owner’s Manual and is the responsibility of the dealer to complete it before delivery to the customer.

3

Image 5
Contents Page Warranty Registration and Policy Hydraulic Farm Loader 595Page Pre-delivery Check List Loader Identification Diagram HSL Model Shown Hose Kit C Hydraulic Hose Kit Identification DiagramsHose Kit a Lift Lock Instructions SafetyElectrocution Hazard Important PrecautionsOverhead Hazard Safety DecalsPage General Instructions and Information General Operation and MaintenanceDo this Operating Suggestions for LoadingDo this Operating Suggestions For BackfillingAttaching the Loader to Your Tractor Attaching the Loader to Your Tractor Removing the Loader from Your Tractor Removing the Loader from Your Tractor POSSlBLE Cause Trouble ShootingPage Page S595 S595 TSL Description Quantity 595, S595, 595 TSL, & S595 TSLSub Frame Parts Table Page Description 595 595 S 595, S595Main Frame Parts Table Page 595 TSL, S595 TSL Hydraulic Plumbing Diagram Description Qty Plumbing Parts TablePage Description Quantity 595 TSL, S595 TSL595, S595, 595TSL, S595TSL Hydraulic Cylinder AssemblyTSL Bucket Cylinders Lift Description Part NumberPage Clarence Ave Winnipeg, MB. R3T 1T2 Division Locations