IPSO 170, 120 installation manual Pre-Installation Inspection

Page 10

Tumblers – 120 and 170

Installation

Pre-Installation Inspection

Upon delivery, visually inspect the crate, carton and parts for any visible shipping damage. If the crate, carton, or cover is damaged or signs of possible damage are evident, have the carrier note the condition on the shipping papers before the shipping receipt is signed, or advise the carrier of the condition as soon as it is discovered.

Remove the crate and protective cover as soon as possible and check the items listed on the packing list. Advise the carrier of any damaged or missing articles as soon as possible. A written claim should be filed with the carrier immediately if articles are damaged or missing.

IMPORTANT: Warranty is void unless tumbler is installed according to instructions in this manual. Installation should comply with minimum specifications and requirements detailed herein, and with applicable local gas fitting regulations, municipal building codes, water supply regulations, electrical wiring regulations, and any other relevant statutory regulations. Due to varied requirements, applicable local codes should be thoroughly understood and all pre-installation work arranged for accordingly.

9

© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT

4-08-45

Image 10
Contents On-Premise Laundry Planning Handbook Contents Model Identification IntroductionGas Steam/Thermal Oil Pound Tumblers 120 Conversion Table Multiply To ObtainGas Models Specifications and DimensionsSpecifications Pound Steam ModelsExhaust Outlet Dimensions and Locations Models 120L/N Pound Tumbler Dimensions Exhaust Outlet LocationsCabinet Dimensions Models 120L/N 120SExhaust Outlet Dimensions and Locations Models 170L/N/S Cabinet Dimensions Models170L/N/S Models Electrical Connection Gas Connection Electric and Gas Connection Locations for Gas ModelsNon-CE 170S Electric and Steam Connection Locations for Steam ModelsModels Electrical Connection Non-CE Installation Pre-Installation InspectionTumbler Enclosure Make-Up Air Exhaust RequirementsLayout VentingIndividual Venting Duct Equivalent Length Diameter Rigid Straight DuctTMB2103N Manifold Venting Duct Pound Mm DuctDuct Pound Station Mm Duct TWO Manifold AssembliesElectrical Requirements