WARNING

To reduce the risk of severe injury, clearance of tumbler cabinet from combustible construction must conform to the minimum clearances.

W056

1

2

3

 

 

4

5

6

7 TMB2020N

8

TMB2020N

NOTE: Shaded areas indicate adjacent structure.

10.5 in. (13 mm) recommended between machines for removal or installation.

2Allow 2-4 in. (51-102 mm) opening at top of machine to aid in removal or installation. A removable trim piece may be used to conceal the opening; zero clearance allowed for trim.

34 in. (102 mm) maximum header thickness

4Minimum clearance permitted for remainder: Gas 4 in. (102 mm), Steam 12 in. (305 mm)

5Guard

6Provision for Make-Up Air

724 in. (610 mm) minimum, 36 in. (914 mm) recommended for maintenance purposes

80.25 in. (6 mm) recommended for removal or installation purposes, zero clearance allowed

Figure 1

4-08-45

© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT

10

Image 11
Contents On-Premise Laundry Planning Handbook Contents Gas Steam/Thermal Oil Pound IntroductionModel Identification Conversion Table Multiply To Obtain Tumblers 120Steam Models Specifications and DimensionsSpecifications Pound Gas Models120S Pound Tumbler Dimensions Exhaust Outlet LocationsCabinet Dimensions Models 120L/N Exhaust Outlet Dimensions and Locations Models 120L/N170L/N/S Cabinet Dimensions ModelsExhaust Outlet Dimensions and Locations Models 170L/N/S Non-CE Electric and Gas Connection Locations for Gas ModelsModels Electrical Connection Gas Connection Models Electrical Connection Non-CE Electric and Steam Connection Locations for Steam Models170S Pre-Installation Inspection InstallationTumbler Enclosure Venting Exhaust RequirementsLayout Make-Up AirDuct Equivalent Length Diameter Rigid Straight Duct Individual VentingTMB2103N Manifold Venting Mm Duct Duct PoundTWO Manifold Assemblies Duct Pound Station Mm DuctElectrical Requirements