Pelco operation manual This page intentionally left blank Pelco Manual C521M 6/95

Page 4

(This page intentionally left blank.)

iv

Pelco Manual C521M (6/95)

Image 4
Contents AZL-Azmith and Elevation Table of Contents Revision History List of IllustrationsManual # Date Comments C521M Original version This page intentionally left blank Pelco Manual C521M 6/95 Risk of Electric Shock Do not Open Installation Connector InstallationScope DescriptionAZL Wiring Diagram Pelco Manual C521M 6/95 AZL Meter Adjustment 4.2.1 Preliminary Remarks AZL Front and Rear ViewsPan Meter Adjustment Meter Adjustment Pelco Manual C521M 6/95Tilt Meter Adjustment SpecificationsElectrical OperationPelco Manual C521M 6/95 Warranty and Return Information Returns