Teledyne HPM 4/6 instruction manual Quick Start Instructions

Page 4

1.0 Quick Start Instructions

1. Unpack unit and insure battery is installed

3.Slide switch to DV4 or DV6 position according to tube type

5.Slide switch to center/off position when not in use.

2.Connect thermocouple tube.

4.Indicated pressure is displayed on LCD display.

Manual: 153-082010_HPM 4-6 Vacuum Gauge

Page 4 of 12

Image 4
Contents Teledyne Hastings Manual Print History Table of Contents Quick Start Instructions Specifications A22001, A32003Vacuum Sensor DV-4 or DV-6 series Battery Installation InstallationReceiving Inspection General Information Sensor Electrical ConnectorPressure Measurements Manual 153-082010HPM 4-6 Vacuum Gauge Calibration in a Vacuum System CalibrationCalibration with a Reference Tube Manual 153-082010HPM 4-6 Vacuum Gauge Maintenance Authorized MaintenanceWarranty Repair Policy WarrantyNon-Warranty Repair Policy