Simrad MN000802A-G manual

Page 26

Place the internal locking nut over the end of the interconnection cable, then attach connectors B and C to the connectors (as shown in the figure).

The broken line shows the route for the interconnection cable.

Attach connector D to one of the screws close by to provide an Earth (as shown in the figure).

The wiring details for the connector ends (B, C, and D) are as follows:

2 kW interconnection cable (NS003101) connector ends

Pin

Color/Name

AWG size

B

C

D

1

Green (big)

#12

 

1

 

 

 

 

 

 

 

2

Yellow (big)

#12

 

2

 

 

 

 

 

 

 

3

Green (thin)

#24

7

 

 

 

 

 

 

 

 

4

Clear Coax signal

#24

4

 

 

 

 

 

 

 

 

5

Drain wire for 4

#24

5

 

 

 

 

 

 

 

 

6

Drain wire for 7

#24

3

 

 

 

 

 

 

 

 

7

Black Coax signal

#24

2

 

 

 

 

 

 

 

 

8

White

#24

6

 

 

 

 

 

 

 

 

Image 26
Contents KW Radar Industry Canada KW Radar Installation ManualFCC Statement CE ComplianceWarranty Feedback from youContents Connect Northstar 6000i MaintenanceConnect Simrad NX40 / NX45, Northstar M84 / M121 Connect to Lowrance Displays13 2 kW radar system specifications Serial Connectivity PrefaceEthernet Connectivity Please Read Carefully Before USEPage Branding information Introduction to the Navico radar systemBrand Display heads that support the Navico radar system 2 kw Radar overview Serial Connectivity Install the radar Choose the scanner location Dont do thisPower boat installations Scanner model Value half the -3 dB beam Width Yacht installationsHow to find the optimum height for the scanner How to find the theoretical maximum detection range How to reduce false echoes and shadow zones 2 kW scanner dimensionsInstall a scanner on a trestle Install the 2 kW scanner unitInstall the radar processor Check the 2 kW radar parts Page Page Wiring guidelines Page Page Page Yellow #24 White big #12 Shell Braid shield 2 kW radar processor connections Connect the power cable OnlyConnect the ground wire Radar system checklistEthernet Cables Simrad GB40 and Northstar Connect Simrad GB40 or NorthstarParts needed to connect radar to a GB40 or 8000i system Ethernet Crossover cableAT10-HD Optional parts to connect GB40 onlyOptional parts to connect GB40 Simrad GB40 connection using SimNet heading Northstar 8000i / Simrad GB 40 using Nmea 0183 heading Key Part Description NumberPage Pin Function Commision the radar using a GB40 or¾ tarting up Radar ¾ To enter Radar setup options ¾ Set Radar Range offset trigger Delay¾ Select OK to confirm the new setting ¾ To correctRadar Power on Action Radar informationRadar connection kit AA002461 Quanti Part name Connect Simrad NX40 / NX45, Northstar M84 / M121Parts needed Connect the 2 kW radar processor to an M84 or M121 Display NOR¾ Park position Set up the radar with the Northstar M84 or M121¾ To enable the radar functionality ¾ Zero bearing¾ Antenna height Serial comms extension cables + adaptor Quanti Part name Connect Northstar 6000iParts needed to connct to a Northstar 6000i Connect the 2 kW radar processor to a 6000i or 6100i display Nmea AUXPage Nmea 1 in a Remote Power OUT ShieldPower Nmea 1 in BPage ¾ Power on Option Before you turn on the radar for the first time ¾ Turn on the radar as follows¾ Turn the radar off Turn the radar onConfigure the navigator communications Adjust the appearance settingsCalibrating the radar Disable the heading sensor inputHeading sensor requirements Prepare for calibrationSet the STC Curve Set the trigger delayTune the radar ¾ To select a different curvePress Page 2, Page 3, Page 4, and Install Set the heading calibration heading sensor installedPress Page 3, Page 4, and Install Restore the factory appearance settings Set the heading calibration heading sensor not installedRestore all the factory settings Press Sea Clutter Manual tuning procedure for the 6000i or 6100i system¾ Next, set the scale to 1/8 nautical miles as follows RIM300 Radar Interface Module Quantit Part name Connect to Lowrance DisplaysParts needed to connect to Lowrance displays Heading Sensor Optional Quantit Part Name10.2 RIM300 Setup the radar with Lowrance displays Setup the basics Radar Setup ¾ Trigger Delay PreparationTrigger Delay Main Bang SuppressionAdjust Main Bang Suppression Before heading line adjustment After heading line adjustment Scanner maintenance MaintenanceGeneral maintenance Other maintenance items Radar is not operating correctly Technical support, service and repairsTroubleshoot the radar If the scanner fails to turnConfirm the equipment installed How to reduce noise and interferenceMake sure the power is present and correctly wired Are range rings displayed? Make Model Serial Number Software VersionDC input To 15.6 V DC DC 12 V system only 13 2 kW radar system specificationsKW scanner KW Radar processor specifications NS-RDR-1021MD