Jackson TS-44GP, TSC-66, TS-66G, TSC-44 Rear View, Typical Electric and GAS Booster Dimensions

Page 23

SECTION 1: SPECIFICATION INFORMATION

TYPICAL ELECTRIC AND GAS BOOSTER DIMENSIONS

Electric Booster Dimensions (Typical)

301/2"30(775-1/2”mm) 24" (61024” mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OUTLET

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3/4" NPT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Coupling for

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

18”

 

 

 

 

 

 

 

 

 

 

 

Temperature/Pressure

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Relief Valve

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INLET

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Electical connection from side or below

SIDE VIEW

18”

18" (457 mm) 6"

(1526”mm)

77/8"

11

 

7-7/8”

 

(200 mm) 21/4

33//4"

12”

 

(83 mm)

2”

 

 

3

 

6”

/4" NPT Nipple

6" (152 mm)

REAR VIEW

36" (914 mm)36” PMG-200

20-3/4”

Alternate TPRV

LocationElectrical

Electrical

25-1/8”

Gas

Water

Water

Water Outlet

31-1/4”

 

Water Inlet

 

Inlet

Outlet

Inlet

 

 

Gas Inlet

 

 

 

 

 

 

6”

LEFT SIDE VIEW

Gas Booster Dimensions

 

 

 

 

(Typical)

 

 

36" (914 mm) PMG-200

 

 

 

 

Alternate

4" (102 mm)

TPRV

 

Flue

 

 

Location

Vent Adapter

 

Water

Water

Gas

Water Outlet

 

Water Inlet

 

Inlet

Outlet

Inlet

 

Gas Inlet

 

 

 

 

 

RIGHT SIDE VIEW

TS Series Conveyors Technical Manual 7610-002-98-29

Issued: 02-15-2006 Revised: N/A

16

Image 23
Contents Technical Manual Installation Manual for Export UnitsONE Year Limited Parts & Labor Warranty Manufacturers WarrantyStop Pare Arret Revision Made Applicable Details Date ECN Nomenclature for the Models Covered in this Manual TS-44GPTable of Contents VII Troubleshooting Electrical SchematicsSection Specification Information Specification Information Electrical Requirements TS-44/TSC-44 Dimensions Typical dimension of the auxillary rinse tank found on Wall TS-66/TSC-66 Left to Right Dimensions Gas-heated models TS-66/TSC-66 Right to Left Dimensions Specification Information TS/TSC-44 Dimensions TS/TSC-66 Dimensions Dishtable DimensionsSection A-A Side Loader Left to Right Dimensions Roll Shield Opening Side Loader Right to Left DimensionsSide Loader Installed Dimensions Side Loader Dimensions Left to Right installation shown for referenceScrap Trough Dimensions Rear View Typical Electric and GAS Booster DimensionsSection Installation & Operation Instructions Installation Instructions INSTALLATION/OPERATION InstructionsIncoming Power Connection One of the extra openings in the back of the control box Deliming Operations Curtain Installation Diagrams Side Loader Installation & Operation Instructions Page Installation & Operation Instructions Detergent Control Installation Instructions Section Preventative Maintenance Preventative Maintenance Section Troubleshooting Common Problems TroubleshootingItems Torque Spec Torque Settings
Related manuals
Manual 6 pages 57.62 Kb Manual 6 pages 10.77 Kb