Jackson TS-44GP, TS-66G, TSC-44, TSC-66GPP Electrical Schematics, VII Troubleshooting

Page 7

TABLE OF CONTENTS

 

Pawl Bar Assemblies

66

 

TS/TSC-44 Rack Rail Assembly

67

 

TS/TSC-66 Rack Rail Assemblies

68

 

Drive Assembly

69

 

Float Switch Components/Scrap Basket Assembly

72

 

Miscellaneous Parts & Weldments

73

 

Strainers

74

 

Curtains/Tub Magnets

75

 

Exhaust Fan Control Option/Table Limit Switches

76

 

Side Loader Section:

 

 

Loader Track Assemblies

77

 

Pawl Bar Assemblies

78

 

Pawl Bar Roller Bracket Assemby

79

 

Vent Cowl Option

80

 

Rinse Fill Option

81

VI.

ELECTRICAL SCHEMATICS

 

 

TS-44/TSC-44

 

 

208-230 Volts, 60 Hz, 1 Phase

83

 

208-230 Volts, 60 Hz, 3 Phase

84

 

460-600 Volts, 60 Hz, 3 Phase

85

 

460 Volts, 60 Hz, 3 Phase Dual Connection

86

 

TS-44GP/TSC-44

 

 

208-230 Volts, 60 Hz, 1 Phase

87

 

208-230 Volts, 60 Hz, 3 Phase

88

 

460 Volts, 60 Hz, 3 Phase

89

 

TS-66/TSC-66

 

 

208-230 Volts, 60 Hz, 1 Phase

90

 

208-230 Volts, 60 Hz, 3 Phase

91

 

460 Volts, 60 Hz, 3 Phase

92

 

TS-66GP/TSC-66GP

 

 

208-230 Volts, 60 Hz, 1 Phase

93

 

208-230 Volts, 60 Hz, 3 Phase

94

 

460-600 Volts, 60 Hz, 3 Phase

95

 

Conveyor Side Loader & Exhaust Fan Hook-Up Schematic

96

VII.

TROUBLESHOOTING

97

iv

Image 7
Contents Technical Manual Installation Manual for Export UnitsONE Year Limited Parts & Labor Warranty Manufacturers WarrantyStop Pare Arret Revision Made Applicable Details Date ECN Nomenclature for the Models Covered in this Manual TS-44GPTable of Contents VII Troubleshooting Electrical SchematicsSection Specification Information Specification Information Electrical Requirements TS-44/TSC-44 Dimensions Typical dimension of the auxillary rinse tank found on Wall TS-66/TSC-66 Left to Right Dimensions Gas-heated models TS-66/TSC-66 Right to Left Dimensions Specification Information TS/TSC-44 Dimensions TS/TSC-66 Dimensions Dishtable DimensionsSection A-A Side Loader Left to Right DimensionsRoll Shield Opening Side Loader Right to Left DimensionsSide Loader Installed Dimensions Side Loader Dimensions Left to Right installation shown for referenceScrap Trough Dimensions Rear View Typical Electric and GAS Booster DimensionsSection Installation & Operation Instructions Installation Instructions INSTALLATION/OPERATION InstructionsIncoming Power Connection One of the extra openings in the back of the control box Deliming Operations Curtain Installation Diagrams Side Loader Installation & Operation Instructions Page Installation & Operation Instructions Detergent Control Installation Instructions Section Preventative Maintenance Preventative Maintenance Section Troubleshooting Common Problems TroubleshootingItems Torque Spec Torque Settings
Related manuals
Manual 6 pages 57.62 Kb Manual 6 pages 10.77 Kb