Graco G250HR, G3000HR, g250 important safety instructions Grounding

Page 6

Installation

Grounding

1.Ground the flow meter by connecting a grounded cable to the sensor.

Have a qualified electrician check the electrical grounding continuity between the flow meter sensor and a true earth ground; remove the cable connec- tor from the sensor and measure the resistance from the cable connector Pin B to true earth ground. Refer to FIG. 2.

If the resistance is greater than 25 ohms, check the cable ground connection. Refer to FIG. 2. Reconnect the ground sheath or replace the cable. Do not oper- ate the system until the problem is corrected.

2.Always ground the fluid supply unit, using one of the following options:

a.Mount the meter to a grounded conductive sur- face, or

b.Connect the conductive fluid hose to the meter inlet and outlet, or

c.Connect a ground wire to the meter's M6 mounting holes.

3.Never use the flow meter with an electrostatic gun isolation stand.

 

 

 

A +10-30 Vdc Supply (red)

C

B

A

B

Ground (black)

C

Signal Out (white)

 

 

 

 

 

 

 

7379A

FIG. 2

6

308778L

Image 6
Contents Volumetric Fluid Flow Meter Important Safety InstructionsContents ModelsSkin Injection Hazard Equipment Misuse Hazard Installation Installing the Flow MeterDust and Foreign Matter Grounding Flow Meter Function Pressure Relief Procedure Flow Volume RangeOperation Recommended UsageTroubleshooting Problem Cause SolutionMaintenance Residue Build-up on the Meter GearsFlushing Cleaning or Servicing the Meter Chamber Parts Flow Meter Kits, for ProMix 2KS Wall Fluid Panel15V804 G3000 Meter Kit 15V827 G3000HR Meter Kit Bare Meter Assemblies Screw239716 G3000 Meter 244292 G3000HR Meter 249426 G250 Meter 249427 G250HR Meter Dimensions G3000 and G3000HRG250 and G250HR Technical Data Pressure Drop Curve Graco Standard Warranty Graco Information