Furuno GP-1850WD installation manual Flush mounting of display unit

Page 11

1. INSTALLATION

Flush mounting

Note: Use supplied pan head screws when the thickness of the bulkhead is from 11 to 14

mm.For bulkhead which exceeds 14 mm in thickness the length of the pan head screws should be bulkhead thickness plus 7.3±1.5 mm. Also the length of B should max. 7mm.

B A

1.Prepare a cutout in the mounting location whose dimensions are as shown on the next page.

2.Fix the display unit by six pan head screws M4 X 20. Refer to the outline drawing on page D-2.

6-R2.25

Pan head screws

0.5

 

0.5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

147

 

89

 

 

 

 

 

 

 

Flush mount

242 0.5

4.5

244

 

 

 

1

50

15 0.5

238 1

(Cutout for flush mount)

143 1

Flush mounting of display unit

3

Image 11
Contents Back Page Safety Instructions This page is intentionally left blank System Configuration Optional equipment Standard supplyIii Optional equipment con’tThis page is intentionally left blank Tabletop, overhead mounting methods Installation of Display UnitMounting considerations Tabletop, overhead mounting of display unit Mounting procedureTabletop, overhead mounting Flush mounting of display unit Flush mountingHow to assemble the connector Installation of Antenna UnitDisplay unit, rear view Power cableConnecting the power cable to the battery Extending antenna cable length Antenna unitGround Cable extension CP20-01700, CP20-01710 Waterproofing connectorWaterproofing connector Extension cable line-up in case of 15 m, 30 m or 50 mFabrication of coaxial cable How to attach the N-P-8DFB connectorOutput format window Port Nmea SettingNmea port RTCM104 Output Dgps portSelect sentence window Output Data SentencesAnt. height window Antenna HeightInput/Output data sentences DGPS/WAAS options window Dgps SettingBeacon baud rate window Beacon frequency windowGR-7000A-1650-15N-019S GR-7000A-1650-10N-019Removing cover assembly DisassemblyProcedure Chassis assembly Installation of beacon receiverDismounting chassis assembly Connecting the coaxial cables in GR-7000A Installation of Dgps beacon receiverAttaching cable tie Wiring the Cable assemblyRemounting the cover Attaching chassis assemblyMemory, I/O Test Display Checking the beacon receiverThis page is intentionally left blank Packing List GP-1850WD(E019 GP-1850WD(E 工事材料表 20AG-X-9405 Page Page Feb Feb Page Page 指示器 Page 00080936710