Furuno GP-1850WD Installation of beacon receiver, Dismounting chassis assembly, Chassis assembly

Page 25

4. INCORPORATION OF DGPS BEACON RECEIVER KIT (for GP-1850W)

Installation of beacon receiver

Procedure

1.Dismount chassis assembly from panel/chassis assembly by disconnecting the connector and PH8P from J8 on MAIN Board shown in the figure below.

Remove two ties (CV-100).

Chassis assembly

PH8P

Connector

Panel assembly

Dismounting chassis assembly

2.Dismount heat sink from chassis assembly by unfastening three screws on the ANLG board, loosening a screw at TR fixing plate and disconnecting the connector of the mini pin coax cable.

ANLG board

Screws (3 X 8), 3pcs.

 

Mini pin coax cable

Heat sink

TR fixing plate

Chassis assembly

17

Image 25
Contents Back Page Safety Instructions This page is intentionally left blank System Configuration Optional equipment Standard supplyIii Optional equipment con’tThis page is intentionally left blank Mounting considerations Installation of Display UnitTabletop, overhead mounting methods Tabletop, overhead mounting Mounting procedureTabletop, overhead mounting of display unit Flush mounting of display unit Flush mountingHow to assemble the connector Installation of Antenna UnitConnecting the power cable to the battery Power cableDisplay unit, rear view Ground Antenna unitExtending antenna cable length Waterproofing connector Waterproofing connectorExtension cable line-up in case of 15 m, 30 m or 50 m Cable extension CP20-01700, CP20-01710Fabrication of coaxial cable How to attach the N-P-8DFB connectorNmea port Nmea SettingOutput format window Port RTCM104 Output Dgps portSelect sentence window Output Data SentencesInput/Output data sentences Antenna HeightAnt. height window DGPS/WAAS options window Dgps SettingBeacon baud rate window Beacon frequency windowGR-7000A-1650-15N-019S GR-7000A-1650-10N-019Procedure DisassemblyRemoving cover assembly Dismounting chassis assembly Installation of beacon receiverChassis assembly Connecting the coaxial cables in GR-7000A Installation of Dgps beacon receiverAttaching cable tie Wiring the Cable assemblyRemounting the cover Attaching chassis assemblyMemory, I/O Test Display Checking the beacon receiverThis page is intentionally left blank Packing List GP-1850WD(E019 GP-1850WD(E 工事材料表 20AG-X-9405 Page Page Feb Feb Page Page 指示器 Page 00080936710