CONTENTS LAYOUT
INTRODUCTION AND GENERAL INSTALLATION REQUIREMENTS
1.0 TECHNICAL DATA
2.0CONDITIONS OF INSTALLATION
2.1SITING GENERAL
2.2FLUES AND CHIMNEYS
2.2.1Brick Chimney, 178mm diameter (7 inch) Stone or Lined Flue and 125mm diameter (5 inch) Flue
2.2.2
2.2.3Metal Fluebox 125mm diameter (5 inch) Flues
2.3SHELF HEIGHT AND SIDE CLEARANCES
2.3.1Combustible Shelf
2.3.2
3.0INSTALLATION OF FIRE
3.1UNPACKING
3.2PREPARATION OF FIRE
3.2.1Spigot Restrictor
3.3METHODS OF INSTALLATION
3.3.1Fixing by Tension Cable
3.3.2Fixing Directly onto Wall
3.4GAS CONNECTION
3.4.1Concealed Connection
3.4.2Front Connection
3.5TEST FOR GAS SOUNDNESS
4.0COMMISSIONING
4.1INSTALL FUEL EFFECT COMPONENTS
4.2CHECK GAS PRESSURE
4.3FIT TRIM AND FENDER
4.4TEST FOR SPILLAGE
4.5CHECK IGNITION
4.6CHECK OPERATION OF FSD
5.0INSTRUCT USER
6.0SERVICING INSTRUCTIONS
6.1REMOVE BURNER TRAY
6.2MAIN BURNER INJECTOR
6.3GAS TAP ASSEMBLY
6.4PILOT ASSEMBLY
6.5FUEL EFFECT COMPONENTS
6.6MAIN BURNER
6.7CONTROL KNOB
6.8IGNITION UNIT
6.9IGNITION BATTERY
6.10IGNITION MICRO SWITCH
6.11THERMOCOUPLE BREAK MICRO SWITCH
7.0 HINTS ON FAULT FINDING
8.0 SHORT LIST OF PARTS
2