INSTALLATION, OPERATION AND CARE OF
MODEL VCB SERIES CHARBROILERS
PLEASE KEEP THIS MANUAL FOR FUTURE USE
GENERAL
It is suggested that you thoroughly read this entire manual and carefully follow all of the instructions provided.
INSTALLATION
Before installing, verify that the type of gas supply (natural or propane) agrees with the specifications on the rating plate located on the right inside panel. If the supply and equipment requirements do not agree, do not proceed with the installation. Contact your dealer or
UNPACKING
This charbroiler was inspected before leaving the factory. The transportation company assumes full responsibility for safe delivery upon acceptance of the shipment. Immediately after unpacking, check for possible shipping damage. If the charbroiler is found to be damaged, save the packaging material and contact the carrier within 15 days of delivery.
Carefully unpack charbroiler and place in a
LOCATION
The equipment area must be kept free and clear of combustible substances.
This charbroiler is design certified for installation on a
| Minimum Clearance | Combustible | ||
| From: | Construction | Construction | |
|
|
|
|
|
Back |
| Above Grid Level | 12" (30 cm) | 3" (8 cm) |
| Below Grid Level | 3" (8 cm) | 3" (8 cm) | |
|
| |||
|
|
|
|
|
Sides |
| Above Grid Level | 9" (23 cm) | 0" |
| Below Grid Level | 3" (8 cm) | 0" | |
|
| |||
|
|
|
|
|
– 3 –