FIREPLACE INSTALLATION
Installing Optional Blower Accessories (Cont.)
17
FIREPLACE INSTALLATION
Continued
5.Mount speed control box to switch bracket by placing the plastic control shaft forward through the round opening in the switch bracket (see Figure 26).
6.While supporting speed control, secure control shaft with lock nut by pushing and turning lock nut with pliers clockwise until it is tight against front panel. Place control knob provided on shaft.
7.Turn on power to duplex outlet if previously turned off per the warning in column 2, page 16.
8.Plug in blower power cord.
a.If your firebox is installed as a freestanding unit with an accessory mantel, determine whether the power cord will exit the left side or the right side of the firebox. Route power cord through exit hole and plug the power cord into a wall receptacle near the firebox.
b.If your firebox installation is recessed and/or
CAUTION: Never touch the blower wheel while in operation.
9. | Check to make sure that the power cord is completely clear of the |
| blower wheel and that there are no other foreign objects in blower |
| wheel. Turn blower on and check for operation. Turn blower off |
| by turning knob fully counterclockwise before continuing. |
Model BKT Installation
Note: When installing the BKT
1.Place the green ground wire with ring terminal between the bottom hole on the thermal switch bracket and the top ear hole on the blower assembly. Insert the phillips screw into all three pieces and tighten securely (see Figure 28).
2.Connect wire harness and power cord terminals. Connect the blue jumper wire to the blower motor terminal and the right side terminal of the thermal switch. Connect the black wire to the left side of the thermal switch and the white wire to the other remaining blower motor terminal.
Note: The power cord outer insulation sleeve may have to be stripped slightly to allow enough wire length to reach and make all connections. DO NOT trim excessive length away. Just enable enough to make all connections securely.
3.Place the blower against the lower rear wall of the firebox outer wrapper with the exhaust port directed upward and the thermodisc positioned up near the fireplace bottom. The thermodisc must be oriented near the fireplace bottom as shown in Figure 28 in order to sense temperature and properly operate. The blower will be held in position against the back wall by the magnets incorporated onto the blower housing (see Figure 28).
4.Be certain that all wire terminals are securely attached to ter- minals on blower motor and thermal switch and that the screw for the thermodisc bracket and green ground wire is tight.
10. Peel off the backing paper and stick the supplied wiring diagram |
decal on the firebox bottom approximately 12" in front of the |
blower (see Figure 27). |
Switch | Speed Control |
| |
Bracket | Blower |
|
| Control | Duplex Outlet |
Control | (Located underneath |
Power Cord
Thermal
Switch
Bracket
Black
Wire
Phillips Screw
Thermal Switch
White Wire |
|
Blue Wire | Magnetic |
| Strips |
Air Flow |
|
Direction |
|
Ring Terminal on Green Wire
Knob | Locknut | Shaft | firebox floor against |
|
|
| lower right outside wall) |
Figure 26 - Attaching Speed Control to Firebox
Wiring Diagram Decal
12" in Front of Blower
Figure 27 - Location of Wiring Diagram Decal (Model May Vary From Illustration)
Route BKT |
| |
Blower Through | Thermodisc | |
This Area | ||
| ||
Side View Firebox Bottom | ||
Figure 28 - Blower Model BKT |
Air Flow Direction Magnets
Blower
Location
www.desatech.com |