LFP33NR
UNVENTED NATURAL GAS FIREPLACE
INSTALLATION
Continued
Mantel Clearances for Built-In Installation
If placing mantel above
If your installation does not meet the below minimum clearances, you must:
• raise the mantel to an acceptable height,
INSTALLING GAS PIPING TO FIREPLACE LOCATION
NOTICE: A qualified service per- son must connect fireplace to gas supply. Follow all local codes.
Installation Items Needed
Before installing fireplace, make sure you have the items listed below.
• piping (check local codes) |
OR
• remove the mantel.
Wall board or facing material (above firebox) may be of combustible material, including decorative mantel ornaments or other similar projec- tions off of the facing material.
Framing
Material
Firebox
Mantel Shelf
10"
8"
6"
2 1/2"
Noncombustible Material May Project Off this Surface above the Firebox Hood
13" 16" 19" 21"
• sealant (resistant to LP/propane gas) | |
• manual shutoff valve * | |
• test gauge connection * | |
• | sediment trap |
• | tee joint |
• | pipe wrench |
• approved flexible gas line with gas con- | |
| nector (if allowed by local codes) (not |
| provided) |
*An A.G.A.
WARNING: Never connect fireplace to private
Supplied Firebox
Hood Must Be
Used at All Times
Note: All vertical measurements are from top of fireplace hood opening to bottom of mantel shelf.
These minimum clearances replace any other recommended clearances supplied with your ANS Z21.11.2 approved gas logs.
known as wellhead gas.
CAUTION: Use only new, black iron or steel pipe. Inter-
Figure 15 - Minimum Mantel Clearances for Built-In Installation
10 | 104887 |