Desa VV36NB(1), V36NR-B, V36P-A Installing GAS Piping to Fireplace Location, Blower Wiring Diagram

Page 18

18

FIREPLACE INSTALLATION

Installing Optional Blower Accessories (Cont.)

 

Installing Gas Piping to Fireplace Location

 

 

FIREPLACE INSTALLATION

Continued

Blower Wiring Diagram

CAUTION: Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation. Verify proper operation after servicing.

Variable

Fan SwitchFan Switch

(N.O.)

Off 1

2

Black

 

On

 

Blue

110/115

V.A.C.

Black

Blower

 

White

Motor

Green

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 29 - Blower Wiring Diagram for Thermostat-Controlled Models

INSTALLING GAS PIPING TO FIREPLACE LOCATION

WARNING: A qualified service person must con- nect fireplace to gas supply. Follow all local codes.

CAUTION: For propane/LP units, never connect fireplace directly to the propane/LP supply. This heater requires an external regulator (not supplied). Install the external regulator between the fireplace and propane/LP supply.

Installation Items Needed

Before installing fireplace, make sure you have the items listed below.

external regulator (supplied by installer)

piping (check local codes)

sealant (resistant to propane/LP gas)

equipment shutoff valve *

test gauge connection *

sediment trap

tee joint

pipe wrench

approved flexible gas line with gas connector (if allowed by lo- cal codes)

*A CSA design-certified equipment shutoff valve with 1/8" NPT tap is an acceptable alternative to test gauge connection. Purchase the CSA design-certified equipment shutoff valve from your retailer.

For propane/LP connection only, the installer must supply an external regulator. The external regulator will reduce incoming gas pressure. You must reduce incoming gas pressure to between 11 and 14 inches of water. If you do not reduce incoming gas pressure, fireplace regulator damage could occur. Install external regulator with the vent pointing down as shown in Figure 30. Pointing the vent down protects it from freezing rain or sleet.

CAUTION: Use only new, black iron or steel pipe. Internally-tinned copper tubing may be used in certain areas. Check your local codes. Use pipe of 1/2" diam- eter or greater to allow proper gas volume to fireplace. If pipe is too small, undue loss of volume will occur.

Installation must include an equipment shutoff valve, union, and plugged 1/8" NPT tap. Locate NPT tap within reach for test gauge hook up. NPT tap must be upstream from fireplace (see Figure 31, page 19).

IMPORTANT: Install main gas valve (equipment shutoff valve) in an accessible location. The main gas valve is for turning on or shutting off the gas to the appliance.

Check your building codes for any special requirements for locating equipment shutoff valve to fireplaces.

Apply pipe joint sealant lightly to male NPT threads. This will prevent excess sealant from going into pipe. Excess sealant in pipe could result in clogged fireplace valves.

WARNING: Use pipe joint sealant that is resistant to liquid petroleum (LP) gas.

External

Propane/LP

Regulator

Supply Tank

Vent

Pointing

Down

Figure 30 - External Regulator with Vent Pointing Down (Propane/LP Only)

For..com

111252-01D

Image 18
Contents OWNER’S Operation Installation Manual For Your SafetyFor Your Safety What to do if YOU Smell GAS Table of Contents Safety InformationSafety Information Product Identification Local CodesProduct Features PRE-INSTALLATION PreparationLocation and Space Requirements Clearances Framing and FinishingLocation of Termination CAP Balcony with Perpendicular Side WallVenting Installation Instructions Installation PrecautionsInstallation Planning Horizontal Termination InstallationInstalling Horizontal Vent Cap Noncombustible Exterior Horizontal Termination Configurations Ground Floor InstallationCorner Installation Venting with Two 90 Elbows Installation for Vertical Termination Flat Ceiling InstallationVertical Termination Configurations High Altitude Installation Parts Lists for Venting Kits and ComponentsDesa 5/8 Pipe & Vent Kits Parts Lists for Venting Kits and COMPO- Nents Fireplace InstallationInstalling Optional Blower Accessories Model BK InstallationModel BKT Installation Blower Model BKTInstalling GAS Piping to Fireplace Location Blower Wiring DiagramPressure Testing Gas Supply Piping System Connecting Fireplace to GAS SupplyInstallation Items Needed Checking GAS ConnectionsInstalling Optional Wall Mount Switch GWMS2 Pressure Testing Fireplace Gas ConnectionsReplace the switch bracket Removing Louver Panels Cleaning Glass DoorREMOVING/REPLACING Glass Door Removing Glass DoorsInstalling Rear Brick Panel Installing LOGS, Lava Rock and Glowing Embers Installing Log No Installing Log No Installing LogTo Appliance For Your Safety Read Before LightingTo Turn OFF GAS LightingRemote Operation Cghrctb Operating FireplaceOptional HAND-HELD ON/OFF Series Models Ghrcb and CghrctbInspecting Burners Operating Optional Blower AccessoryPilot Assembly Operating Optional GWMT1 Wall Mounted ThermostatPilot and Burners Cleaning and MaintenanceGlass Door LogsTroubleshooting Observed Problem Possible CauseObserved Problem Possible Cause Remedy Gas leak. See Warning statement Illustrated Parts Breakdown CHDV36NR-BParts List Parts ListBurner Assembly for Models KEY Part Number Description QTY Specifications Replacement Parts Service HintsTechnical Service Parts Under WarrantyOwners Registration Form Postage Required Accessories Warranty Information Limited Warranty DIRECT-VENT Fireplace