VENTING INSTALLATION INSTRUCTIONS

Installation Planning

VENTING INSTALLATION INSTRUCTIONS

Continued

INSTALLATION PLANNING

There are two basic types of direct-vent installation:

Horizontal Termination

Vertical Termination

Horizontal Termination Installation

IMPORTANT: Horizontal square terminations require only inner portion of wall firestop. Horizontal installations using round termi- nation require exterior portion of wall firestop available only in vent kit 01491 for V and VV Series or SDHTRK-58 for CHDV Series (see Figure 14, page 10).

1.Set the fireplace in its desired location and determine the route your horizontal venting will take. Do not secure the fireplace until all venting has been installed. Some installations require sliding the fireplace in and out of position to make final vent- ing connections. Figures 14 through 18 on pages 10 through 12 show different configurations for venting with horizontal termination that will help you decide which application best suits your installation. Check to see if wall studs or roof rafters are in the path of your desired venting route. If they are, you may want to adjust the location of the fireplace.

2.Direct vent pipe sections and components are designed with special twist-lock connections.

Twist-Lock Procedure: The female ends of the pipes have lock- ing lugs (indentations). These lugs will slide straight into match- ing slots on the male ends of adjacent pipes. Push pipe sec- tions together and twist one section clockwise approximately one-quarter turn until the sections are fully locked (see Figure 8). Note: Horizontal runs of vent must be supported every three feet. Use wall straps for this purpose.

3.Use a 45° elbow to connect venting system to fireplace flue col- lar. The elbow is designed to be twist-locked onto the flue collar as described in step 2. IMPORTANT: Do not attempt to alter the configuration of the elbow by cutting, twisting, bending, etc.

4.Assemble the desired combination of pipe and elbows to the fireplace flue collar. If there are long portions of venting run, pre-assembled pipe sections may be installed as subassemblies for convenience.

5.Carefully determine the location where the vent pipe assembly will penetrate the outside wall. The center of the hole should line up with the center-line of the horizontal vent pipe. Mark the wall for a 10 3/4" x 10 3/4" square hole. Cut and frame the square hole in the exterior wall where the vent will be terminated. If the wall being penetrated is constructed of noncombustible material, such as masonry block or concrete, a 8 1/2" hole with zero clearance is acceptable (see Figure 9).

Male

Slots

Female Locking Lugs

Figure 8 - Vent Pipe Connections

Vent Opening

 

Combustible Wall

10 3/4" Inside Framing

10 3/4"

(273mm)

(273mm)

 

10 3/4"

 

(273mm)

 

(Framing

Vent Opening

Detail)

 

Noncombustible Wall

 

8 1/2"

 

(216mm)

 

 

Center

 

of Hole

Figure 9 - Vent Opening Requirements

For..com

111252-01D

Image 8
Contents For Your Safety What to do if YOU Smell GAS OWNER’S Operation Installation ManualFor Your Safety Table of Contents Safety InformationSafety Information Product Identification Local CodesLocation and Space Requirements Product FeaturesPRE-INSTALLATION Preparation Clearances Framing and FinishingLocation of Termination CAP Balcony with Perpendicular Side WallVenting Installation Instructions Installation PrecautionsInstallation Planning Horizontal Termination InstallationInstalling Horizontal Vent Cap Noncombustible Exterior Horizontal Termination Configurations Ground Floor InstallationCorner Installation Venting with Two 90 Elbows Installation for Vertical Termination Flat Ceiling InstallationVertical Termination Configurations Desa 5/8 Pipe & Vent Kits High Altitude InstallationParts Lists for Venting Kits and Components Fireplace Installation Installing Optional Blower AccessoriesParts Lists for Venting Kits and COMPO- Nents Model BK InstallationModel BKT Installation Blower Model BKTInstalling GAS Piping to Fireplace Location Blower Wiring DiagramConnecting Fireplace to GAS Supply Installation Items NeededPressure Testing Gas Supply Piping System Checking GAS ConnectionsInstalling Optional Wall Mount Switch GWMS2 Pressure Testing Fireplace Gas ConnectionsReplace the switch bracket Cleaning Glass Door REMOVING/REPLACING Glass DoorRemoving Louver Panels Removing Glass DoorsInstalling Rear Brick Panel Installing LOGS, Lava Rock and Glowing Embers Installing Log No Installing Log No Installing LogFor Your Safety Read Before Lighting To Turn OFF GASTo Appliance LightingOperating Fireplace Optional HAND-HELDRemote Operation Cghrctb ON/OFF Series Models Ghrcb and CghrctbOperating Optional Blower Accessory Pilot AssemblyInspecting Burners Operating Optional GWMT1 Wall Mounted ThermostatCleaning and Maintenance Glass DoorPilot and Burners LogsTroubleshooting Observed Problem Possible CauseObserved Problem Possible Cause Remedy Gas leak. See Warning statement Illustrated Parts Breakdown CHDV36NR-BParts List Parts ListBurner Assembly for Models KEY Part Number Description QTY Replacement Parts Service Hints Technical ServiceSpecifications Parts Under WarrantyOwners Registration Form Postage Required Accessories Warranty Information Limited Warranty DIRECT-VENT Fireplace