CLEARANCES

Minimum clearances to combustibles for the fireplace are as follows:

Back, and sides

0"/mm

Perpendicular walls

6" (152mm)

Floor

0"/mm

Ceiling to louver opening

42" (1067mm)

Front

36" (914mm)

Top of Standoffs

0"/mm

Vent

(See venting instructions for

 

specific venting clearances.)

Combustible material with a maximum thickness of 5/8" may be flush with the top front of fireplace .

15"

35A 3/4"

E

1D0 3/8"

13 3/4"

41"F

41 1/4"

68 1/2"

49C5/8"

Nailing Tabs

NOTICE: This fireplace is intended for use as supple- mental heat. Use this fireplace along with your pri- mary heating system. Do not install this fireplace as your primary heat source. If you have a central heat- ing system, you may run system’s circulating blower while using fireplace. This will help circulate the heat throughout the house. In the event of a power outage, you can use this fireplace as a heat source.

FRAMING AND FINISHING

Figure 4 shows typical framing of this fireplace. Figure 5 shows framing for corner installation. All minimum clearances must be met.

For available accessories for this fireplace, see Accessories on page

39.If you are using a separate combustible mantel piece, refer to Figure 6 for proper installation height. You can install noncombus- tible mantels at any height above the fireplace.

Note: Noncombustible mantels may discolor!

36 1/8"

41 1/4"

23 1/2"

Figure 5 - Framing Clearances for Corner Installation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

 

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

Wall

 

 

 

 

 

 

 

 

 

 

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C

 

 

 

 

 

 

 

6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

D

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E

 

 

 

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

G

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Top of Louver Opening

 

 

 

 

 

 

 

Ref.

Mantel Depth

Ref.

Mantel from Top

 

 

 

 

 

 

 

 

 

 

 

 

of Louver Opening

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

14" (356mm)

 

A

 

 

 

16" (406mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

12" (305mm)

 

B

 

 

 

14" (356mm)

 

 

 

3

10" (254mm)

 

C

 

 

 

12" (305mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

8" (203mm)

 

D

 

 

 

10" (254mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

6" (152mm)

 

E

 

 

 

8" (203mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

4" (101mm)

 

F

 

 

 

6" (152mm)

 

 

 

7

2" (51mm)

 

G

 

 

 

4" (101mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 6 - Clearances for Combustible Mantels

Figure 4 - Framing Clearances for Installation Against an Exterior

Wall

For morevisit www..com

111252-01D

Image 5
Contents For Your Safety What to do if YOU Smell GAS OWNER’S Operation Installation ManualFor Your Safety Safety Information Table of ContentsLocal Codes Safety Information Product IdentificationLocation and Space Requirements Product FeaturesPRE-INSTALLATION Preparation Framing and Finishing ClearancesBalcony with Perpendicular Side Wall Location of Termination CAPInstallation Precautions Venting Installation InstructionsHorizontal Termination Installation Installation PlanningInstalling Horizontal Vent Cap Noncombustible Exterior Ground Floor Installation Horizontal Termination ConfigurationsCorner Installation Venting with Two 90 Elbows Flat Ceiling Installation Installation for Vertical TerminationVertical Termination Configurations Desa 5/8 Pipe & Vent Kits High Altitude InstallationParts Lists for Venting Kits and Components Installing Optional Blower Accessories Fireplace InstallationParts Lists for Venting Kits and COMPO- Nents Model BK InstallationBlower Model BKT Model BKT InstallationBlower Wiring Diagram Installing GAS Piping to Fireplace LocationInstallation Items Needed Connecting Fireplace to GAS SupplyPressure Testing Gas Supply Piping System Checking GAS ConnectionsPressure Testing Fireplace Gas Connections Installing Optional Wall Mount Switch GWMS2Replace the switch bracket REMOVING/REPLACING Glass Door Cleaning Glass DoorRemoving Louver Panels Removing Glass DoorsInstalling Rear Brick Panel Installing Log No Installing Log No Installing Log Installing LOGS, Lava Rock and Glowing EmbersTo Turn OFF GAS For Your Safety Read Before LightingTo Appliance LightingOptional HAND-HELD Operating FireplaceRemote Operation Cghrctb ON/OFF Series Models Ghrcb and CghrctbPilot Assembly Operating Optional Blower AccessoryInspecting Burners Operating Optional GWMT1 Wall Mounted ThermostatGlass Door Cleaning and MaintenancePilot and Burners LogsObserved Problem Possible Cause TroubleshootingObserved Problem Possible Cause Remedy Gas leak. See Warning statement CHDV36NR-B Illustrated Parts BreakdownParts List Parts ListBurner Assembly for Models KEY Part Number Description QTY Technical Service Replacement Parts Service HintsSpecifications Parts Under WarrantyOwners Registration Form Postage Required Accessories Limited Warranty DIRECT-VENT Fireplace Warranty Information