Desa T32N, T32P installation manual Clearances, Framing and Finishing

Page 5

PRE-INSTALLATION PREPARATION

Clearances

Framing and Finishing

5

PRE-INSTALLATION

PREPARATION

Continued

CLEARANCES

Minimum clearances to combustibles for the fireplace are as follows:

Back, and sides

0"/mm

Perpendicular walls

6" (152mm)

Floor

0"/mm

Ceiling to louver opening

42" (1067mm)

Front

36" (914mm)

Top

0"/mm

Vent

(See venting instructions for

 

specific venting clearances.)

Combustible material with a maximum thickness of 5/8" may be flush with the top front of fireplace .

135/8"

281/2"

97/8"

91/2"

343/8"

345/8"

541/8"

393/8"

Nailing Tabs

NOTICE: This fireplace is intended for use as supple- mental heat. Use this fireplace along with your pri- mary heating system. Do not install this fireplace as your primary heat source. If you have a central heat- ing system, you may run system’s circulating blower while using fireplace. This will help circulate the heat throughout the house. In the event of a power outage, you can use this fireplace as a heat source.

FRAMING AND FINISHING

Figure 4 shows typical framing of this fireplace. Figure 5 shows framing for corner installation. All minimum clearances must be met.

For available accessories for this fireplace, see Accessories on page

37.If you are using a separate combustible mantel piece, refer to Figure 6 for proper installation height. You can install noncombus- tible mantels at any height above the fireplace. Note: Noncombus- tible mantels may discolor!

323/8"

345/8" 19"

Figure 5 - Framing Clearances for Corner Installation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

 

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

Wall

 

 

 

 

 

 

 

 

 

 

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C

 

 

 

 

 

 

 

6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

D

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E

 

 

 

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

G

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Top of Louver Opening

 

 

 

 

 

 

 

Ref.

Mantel Depth

Ref.

Mantel from Top

 

 

 

 

 

 

 

 

 

 

 

 

of Louver Opening

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

14" (356mm)

 

A

 

 

 

16" (406mm)

 

 

 

2

12" (305mm)

 

B

 

 

 

14" (356mm)

 

 

 

3

10" (254mm)

 

C

 

 

 

12" (305mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

8" (203mm)

 

D

 

 

 

10" (254mm)

 

 

 

5

6" (152mm)

 

E

 

 

 

8" (203mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

4" (101mm)

 

F

 

 

 

6" (152mm)

 

 

 

7

2" (51mm)

 

G

 

 

 

4" (101mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 6 - Clearances for Combustible Mantels

Figure 4 - Framing Clearances for Installation Against an Exterior

Wall

For morevisit www..com

111986-01A

Image 5
Contents For Your Safety What to do if YOU Smell GAS For Your SafetySafety Information Table of ContentsLocal Codes Safety Information Product IdentificationLocation and Space Requirements Product FeaturesPRE-INSTALLATION Preparation Framing and Finishing ClearancesBalcony with Perpendicular Side Wall Location of Termination CAPInstallation Precautions Venting Installation InstructionsInstallation Planning Horizontal Termination InstallationVent Pipe Connections Installing Horizontal Vent Cap Noncombustible Exterior 17 max Horizontal Termination ConfigurationsSquare Termination Corner and Alternate Installation Venting with Two 90 Elbows Horizontal System Installation Using TWO ElbowsFlat Ceiling Installation Installation for Vertical TerminationVenting with One 90 Elbow Vertical Termination ConfigurationsVertical Venting High Altitude InstallationParts Lists for Venting Kits and Components Fireplace InstallationInstalling Optional Blower Accessories Check GAS TypeAttaching Speed Control to Firebox Model BKT InstallationBlower Model BKT Blower Wiring DiagramInstallation Items Needed Installing GAS Piping to Fireplace LocationInstallation Items Needed Connecting Fireplace to GAS SupplyPressure Testing Gas Supply Piping System Checking GAS ConnectionsInstalling Remote Receiver Installing Optional Wall Mount Switch GWMS2Pressure Testing Fireplace Gas Connections Cleaning Glass Door Installing Optional Brick Liner Model BL32DREMOVING/REPLACING Glass Door Removing Louver PanelsInstalling Log No Installing LOGS, Lava Rock and Glowing EmbersInstalling Logs No and No Manual Lighting Procedure For Your Safety Read Before LightingOperating Fireplace Lighting InstructionsAuto Thermostatic Mode Manual ModeOptional HAND-HELD Remote Operation Thermostat Series Models Ghrctb and CghrctbPilot Assembly Operating Optional Blower AccessorySafety Features Inspecting BurnersCleaning Maintenance Observed Problem Possible Cause TroubleshootingObserved Problem Possible Cause Remedy Above Gas leak. See Warning statementVT32PRB CHDV32NR Illustrated Parts BreakdownVT32NRB KEY Part Number Description QTY Parts ListService Hints Replacement PartsTechnical Service SpecificationsOwners Registration Form Postage Required Accessories Warranty Information