Weber GENESIS GOLDB Gas Grill, 55023 1199 manual Installing Work Surfaces Gas Connection Guidelines

Page 13

Installing Work Surfaces &

Gas Connection Guidelines

Install Left Work Surface

 

 

 

 

 

 

Check that all burner valves are off

You will need left work surface, two 1/2 inch bolts, two

 

You will need: burner control knobs.

 

nylon washers and a 7/16 inch or adjustable wrench.

 

Valves are shipped in the OFF position, but you should

 

Insert the left work surface tabs in the slots in the

 

check to be sure that they are turned OFF. Put the

 

frame(1). Slip washers on the bolts and insert the bolts

 

knob on each valve. Check by pushing down and

 

as shown(2). Tighten

 

 

 

 

 

 

turning clockwise. If they do not turn, they are off.

 

 

 

 

 

 

 

 

 

 

 

 

 

(2)

 

 

 

 

 

Proceed to the next step. If they do turn continue

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(1)

 

 

 

 

 

 

 

 

 

 

 

turning them clockwise until they stop, then they are

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

off. Proceed to the next step.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Remove the control panel

(1) Unscrew the two phillips screws, located on the right edge of the control panel.

(2) Take off the burner control knobs.

(2)

(1)

(3) Lift off the control panel.

C017.a

C-1

Image 13
Contents Genesis GOLD-B Liquid Propane GAS Units only Customer Service Center South Hicks Road Palatine, IL WarrantyContents Operating Gas Supply Testing For Installation in CanadaStorage Genesis Gold-B NG Manifold, Hose and regulator assembled Page Remove Grill from Lower Packaging Remove Packaging from GrillPage Install the slide out bottom tray Assembly InstructionsInstalling the warming rack Installing the Warm-Up BasketInstall the bottom shelf Install the condiment basketRemove the control panel Installing Work Surfaces Gas Connection GuidelinesGas Line Piping Install Gas Supply General Specifications for PipingTest Connections Check for gas leaks Install Right Work Surface Reinstall control panel after checking for gas leaksTo Extinguish LightingManual Lighting Cooking CleaningStorage Inspection and Cleaning of the Weber Spider Stopper Guards Annual MaintenanceMain Burner Cleaning Procedure General MaintenanceWeber Spider Stopper Guards Replacing Main Burners Crossover Ignition System Operations Burners burn with a yellow or Flame is low when burner is onOrange flame, in conjunction with Smell of gas