Weber 55023 1199 Reinstall control panel after checking for gas leaks, Install Right Work Surface

Page 16

Reinstall control panel (after checking for gas leaks)

(1)Set the control panel in place over both sides of the frame. Hold the crossover ignition button up while setting the control panel in place.

(2)Line up the control panel with the white plastic plugs in the frame brace. Insert screws and tighten with a Phillips screwdriver until snug. Do not overtighten.

(3)Push each of the burner control knobs onto their valve.

(4)Reinstall Side Burner cover.

(1)

(3)

(2)

Install Right Work Surface

You will need right work surface, two 1/2 inch bolts, two nylon washers and a 7/16 inch or adjustable wrench.

Insert the right work surface tabs in the slots In the frame(1). Slip washers on the bolts and insert the bolts as shown(2). Tighten

(1)(2)

C-4

Image 16
Contents Genesis GOLD-B Liquid Propane GAS Units only Warranty Customer Service Center South Hicks Road Palatine, ILContents Operating Gas Supply Testing For Installation in CanadaStorage Genesis Gold-B NG Manifold, Hose and regulator assembled Page Remove Packaging from Grill Remove Grill from Lower PackagingPage Assembly Instructions Install the slide out bottom trayInstalling the Warm-Up Basket Installing the warming rackInstall the bottom shelf Install the condiment basketInstalling Work Surfaces Gas Connection Guidelines Remove the control panelGas Line Piping Install Gas Supply General Specifications for PipingTest Connections Check for gas leaks Reinstall control panel after checking for gas leaks Install Right Work SurfaceLighting To ExtinguishManual Lighting Cooking CleaningStorage Annual Maintenance Inspection and Cleaning of the Weber Spider Stopper GuardsMain Burner Cleaning Procedure General MaintenanceWeber Spider Stopper Guards Replacing Main Burners Crossover Ignition System Operations Flame is low when burner is on Burners burn with a yellow orOrange flame, in conjunction with Smell of gas