Before energizing the unit, the following system devices must be checked:

____ Is the high voltage power supply correct and in accordance with the nameplate ratings?

____ Is the field wiring and circuit protection the correct size?

____ Is the low voltage control circuit wiring correct per the unit wiring diagram?

____ Is the piping system clean/complete and correct? (A recommendation of all system flushing of debris from

the water-to-refrigerant heat exchanger, along with air purging from the water-to-refrigerant heat exchanger be done in accordance with the Closed-Loop/Ground Source Heat Pump Systems Installation Guide).

____ Is vibration isolation provided? (i.e. unit isolation pad, hosekits)

____ Is unit serviceable? (See clearance specifications on page 6).

____ Are the low/high-side pressure temperature caps secure and in place?

____ Are all the unit access panels secure and in place?

____ Is the thermostat in the OFF position?

____ Is the water flow established and circulating through all the units?

____ Is the duct work (if required) correctly sized, run, taped, insulated and weather proofed with proper unit

arrangement?

____ Is the condensate line properly sized, run, trapped and pitched?

____ Does the indoor blower turn freely without rubbing?

____ Has all work been done in accordance with applicable local and national codes?

____ Has heat transfer fluid been added in the proper mix to prevent freezing in closed system application?

WSHP-SVX04A-EN

25

Image 25
Contents Later Design Sequence Installation Owner DiagnosticsResponsible Refrigerant Practices Contents Fiberglass Wool Pre-installation ChecklistMicrobial Growth General Information Improper Unit Lift Dimensions/Weights/ ClearanceDimensions Wpvj 018-024 LH Wpvj 018-024 RH Wpvj 030-042 LH Wpvj 030-042 RH Wpvj 048-072 LH Wpvj 048-072 RH General Installation Checks InstallationLow Voltage Wiring AC & DC Requirements Filter InstallationWater Connection Unit Installation WpvjUnit Installation Wphf Using Antifreeze Connecting a Distributed Pump Kit to a Closed Loop SystemCleaning and Flushing Water Loop Control Power Transformer Field Installed Power WiringThermostat Location Installation Low Voltage WiringAmpacity Device Electrical RequirementsRLA FLA RLA CSA Case WPHF057 Pre-Start-up Checklist Pre-Start ChecklistSequence Operation Wpvj Operating PressuresOperating Pressure Start-up Checklist and Log Water VolumeWater Pressure Drop Flow ChecksJob Name Model Number Date Serial Number Start-up Checklist LogPreventive Maintenance MaintenanceHazardous Chemicals Warranty Information Standard Warranty Warranty InformationHazardous Service Procedures TroubleshootingGeneral Operation Operation with a Conventional ThermostatUnit short cycles Troubleshooting ChecklistUnit Wiring Wpvj Basic 24V Diagram Unit Wiring Wpvj Tracer ZN510 Diagram Unit Wiring Wphf Basic 24V Diagram Unit Wiring Wphf Tracer ZN510 Diagram Trane