Razor EN_130402 Repair and Maintenance, Replacing the Tires/Tubes, Replacing the Wheels, As shown

Page 5

REPAIR AND MAINTENANCE

qReplacing the Tires/Tubes

Tools Required: 5 mm Allen Wrench

Nuts Bearings

Wheel Hub

Fastener Bolts

1 Completely deflate the tire. Use

2 Assemble the hub using the

Inner Tube

 

a 5 mm Allen wrench to remove the

diagram at right. Tighten bolts

Tire

Bearings

four bolts on the hub. Remove the

using 5 mm Allen wrench.

worn/damaged tire or inner tube

Re-inflate. (Do not exceed 60 PSI.)

 

 

and replace it with a new one.

 

 

 

Note: Be careful not to lose the

 

 

 

four nuts on the opposite side of

 

 

 

the hub.

 

 

 

qReplacing the Wheels

Tools Required: 5 mm Allen Wrench

1 Front wheel sequence.

2 Securely tighten the bolt

3 Rear wheel sequence.

4 Securely tighten the bolt

 

as shown.

 

as shown.

4

Image 5
Contents EN130402 Safety Warnings ContentsBeforeYou Begin Required Tools For AssemblyProper Riding Attire Product I.D. CodeAttaching the Handlebar Assembly instructionsInflating Tires Tools Required 5 mm Allen WrenchDiagram at right. Tighten bolts Tire Repair and MaintenanceReplacing the Tires/Tubes Replacing the WheelsHow to Ride CleaningYour ScooterCheck before riding Collar ClampPage Customer Service Info Safety remindersWarranty