Section 2 - Vehicle Preparation
The Inside Lift has been designed with the shortest height and smallest footprint requirements to allow maximum room for the loading and unloading of your scooter or power chair. If there is 30” of headroom and room for the scooter or chair in the vehicle, then our lift should be able to be installed and operate properly. (The AL055 requires 37” of headroom unless the post is cut for smaller openings)
•To obtain the ideal mounting location and avoid possible interference, the lift should be
Hint: It is always best to check with the customer when determining lift placement and ask permission before drilling through the vehicle’s floor.
•Typical Applications Car
Rear Cargo
Tailgate applications for SUV’s, Station Wagons and Trucks using the offset arm conversion option. (Except AL055)
NOTE: The base should be mounted as far to the rear corner of the vehicle as possible in most rear mount applica- tions. This allows for the maximum reach of the lifting arm.
There are some vehicles that, due to their setup, will not accommodate a standard lift installation. Please check for the following:
•Vehicle must have 30” clear headroom for operation. Be sure and check during “trial fit” that a full range of mo- tion can be achieved without any roof or lift gate interference. (37” headroom required for AL055)
•Spare tire
•Some vehicles have been manufactured with a “false floor” which is made of composite materials. The lift must be anchored to a steel floor or frame.
•Trunk applications must be secured to a flat trunk floor. (AL200 and AL055 only) Make sure that there are not deep wells in the trunk that will affect placement of the base. Most of these can be overcome.
•Offset Arm Applications (Except AL055) - The offset arm allows the lifting arm to reach around to the side of the vehicle. This allows the loading and unloading of the scooter or power chair when there is a tailgate to contend with or when the base location does not allow a straight post to be used. Many times this application is referred to as a “curbside” installation. (See Figure #4.2 or #5.3)
Trial Fit Procedure:
•Place the assembled lift as it is configured in the shipping carton into the desired location.
When using the Offset Post Conversion, bolt the Lifting Arm to the Post using the supplied
•Raise the Lifting Arm to achieve to an 1/8” clearance to the lowest point of the vehicle’s roof that the Lifting Arm will encounter during its travel (usually the door opening or rear A/C vents).
•On the AL200 and AL400, unscrew the Adjustable Link to provide the desired height of the Lifting Arm and bolt the two components together using the supplied 3/8” x 2” hex bolt, washers and 3/8” Stover lock
•Mark the desired position for installation including the power wire and proceed to the wiring Section #3.
3