3M 711/811 owner manual Loading the tag dispenser with tags, Tag Dispenser Supply Roll Shaft

Page 11

Loading the tag dispenser with tags

1Open the Conversion Station cabinet doors and locate the tag dispenser.

2 Locate the supply role shaft.

Tag Dispenser

Supply Roll Shaft

10

711-811_HG_002

3 Rotate the supply roll shaft until it is in the up position.

4Release the stop lever so that it drops into a horizontal position.

On

Off

Jog

812_FSH_001

5Remove the two plastic core inserts from the supply role shaft and install

one on each side of the roll of RFID tags.

812_FSH_004

Tape

6Remove the tape from the roll of RFID tags.

812_FSH_005

9

Image 11
Contents Conversion Station Model 711/811 Page Table of Contents Intended use Safety InformationImportant Notes Japan Safety Label LocationsOperating and Storage Temperature SpecificationsDescription ComponentsAutomatic Tag Dispenser components Using the Tag DispenserTool Kit Operator tool kitTag Dispenser Supply Roll Shaft Loading the tag dispenser with tags812FSH006 Cleaning the spring plate tensioner/guide Cleaning the tag dispenser openingProblem Solution Troubleshooting Tag Dispenser problemsTo order tags Service3M Service phone numbers