HE/001132 | Document No. 001132, Revision 2.0 | Page 14 of 92 |
Agfa HealthCare |
| |
NodeID Livelink : 14140190 | 14 June, 2007 | |
|
|
|
"Workstation" does not foresee additional logic when the system is shut down, regarding storage commitment time outs. In other words: when a storage commit reply does not reach "Workstation" successfully, because "Workstation" was/is down at that point in time, the job will time out and go to FAILED.
A Possible sequence of iterations between the DICOM Store AE and an Image Manager is illustrated in figure
Store
PACS
1. Open Association
2.
3. C-STORE (GSPS)
4.
5. C-STORE (GSPS)
6. Close Association
7. Open Association
6.
7.
8.Close Association
Figure 2.2-1: Example of a Storage AE Sequencing Diagram (with Storage Commit)
The DICOM Store AE may reject the association attempts as shown in the table below: