Braun 403 Lift Operating Instructions, To Open Doors, To Unfold Platform Out, To Unload Passenger

Page 5

Braun Corporation FMVSS No. 403 Quick Reference Installation Sheet 32494

Lift Operating Instructions

A

C

E

DOWN

G

To Open Door(s):

Automatic Door Operator(s):

Press yellow OPEN switch until door(s) are fully open. Release switch.

Manual Door(s):

Manually open door(s) fully and secure.

To Unfold Platform (Out):

Press UNFOLD (orange OUT) switch (see Photo B) until platform stops (unfolds fully – reaches floor level). See Photos C and D. Release switch.

To Unload Passenger:

1.Read notes below! Load passen- ger onto platform facing outward and lock wheelchair brakes.

Note: Outer barrier must be UP and outer barrier latch must be fully engaged before loading pas- senger onto platform. Lower head to clear vehicle door jamb header.

2.Press red DOWN switch until the entire platform reaches ground level (stops) and outer barrier unfolds fully (see Photos H and I). Release switch.

Switch Arm Switch: Slide knob in to DOWN position. See Photo G.

B

D

F

H

I

K

M

UP

O

3.Unlock wheelchair brakes and unload passenger from platform.

Note: Outer barrier must be fully unfolded (ramp position) until the entire wheelchair has crossed the outer barrier. See Photos K and L.

To Load Passenger:

1.Load passenger onto platform fac- ing outward and lock wheelchair brakes.

Note: Outer barrier must be fully unfolded (ramp position) until the entire wheelchair has crossed the outer barrier. See Photos K and L.

2.Press red UP switch until platform stops (reaches floor level). Re- lease switch.

Switch Arm Switch: Slide knob out to UP position.

Note: Outer barrier must be UP and outer barrier latch must be fully engaged before raising platform. Platform will raise above ground level approximately two inches before latch engages fully.

J

L

N

approximately 2”

P

Image 5
Contents DOT Private Use Lift Nhtsa Vehicle Physical Requirements Position LiftChassis Attach Power and Ground CablesSecure Lift Connect Interlocks Adjust Platform AngleLift Pump Module ShippedFollowing operations must be functionally verified Platform Floor Level AdjustmentPlatform Floor Level Position Adjustment To Open Doors Lift Operating InstructionsTo Unfold Platform Out To Unload PassengerManual Operating Instructions Maintenance and Lubrication Schedule Lubrication Diagram Maintenance and Lubrication750 LG Light Grease1500 Maintenance and Lubrication Schedule4500 Level with platform lowered fully and roll stop
Related manuals
Manual 8 pages 23.43 Kb Manual 8 pages 55.79 Kb