Braun 403 dimensions Maintenance and Lubrication Schedule, 1500, 4500

Page 8

Braun Corporation FMVSS No. 403 Quick Reference Installation Sheet 32494

Maintenance and Lubrication Schedule

 

Inspect outer barrier for proper operation

Correct or replace defective parts.

750

Inspect lift for wear, damage or any abnormal

Correct as needed.

Cycles

condition

 

 

 

Inspect lift for rattles

Correct as needed.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Perform all procedures listed in previous section also

 

 

 

 

Platform pivot pin bearings (2)

Apply Light Oil - See Lubrication Diagram

 

 

Platform fold axles (2)

Apply Light Oil - See Lubrication Diagram

 

 

Inboard locator lever bearings (2)

Apply Light Oil - See Lubrication Diagram

 

 

Inboard locator lever slot (2)

Apply Light Oil - See Lubrication Diagram

 

 

Rotating pivot slide arm pivot pins (2)

Apply Light Oil - See Lubrication Diagram

 

 

Parallel arm pivot bearings (16)

Apply Light Oil - See Lubrication Diagram

 

 

Switch arm pivot pin bearings (4)

Apply Light Oil - See Lubrication Diagram

 

 

Hydraulic cylinder bushings (8)

Apply Light Oil - See Lubrication Diagram

 

 

Inspect Lift-Titelatch rollers for wear or damage,

Correct, replace defective parts and/or relubricate.

 

 

positive securement and proper operation (2)

 

 

 

 

Inspect inboard locator for:

Resecure, replace or correct as needed. See

1500

 

• Wear or damage

Platform Angle Instructions and Platform Floor

 

• Proper operation. Inboard locator should just rest

Level Adjustment Instructions.

Cycles

 

 

on top surface of the base plate.

 

 

 

 

Inspect platform fold gear rack and gear weldment

Remove foreign objects, replace defective parts

 

 

teeth for foreign objects, wear or damage (bent,

and secure as needed.

 

 

deformed or misaligned), positive securement and

 

 

 

 

proper operation

 

 

 

 

Inspect switch arm components for wear or dam-

Replace defective parts.

 

 

age, and for proper operation

 

 

 

 

Inspect microswitches for securement and proper

Resecure, replace or adjust as needed.

 

 

adjustment.

 

 

 

 

Make sure lift operates smoothly

Realign towers and vertical arms. Lubricate or

 

 

 

 

correct as needed.

 

 

Inspect external snap rings / e-clips:

Resecure or replace if needed.

 

 

Rotating pivot slide arm pivot pins (2 per pin)

 

 

 

 

Rotating pivot slide arm roller axles (2 per axle)

 

 

 

 

Platform fold axles (1 per axle)

 

 

 

 

Inboard locator lever bracket pins (1 per pin)

 

 

 

 

Lift-Titelatch gas (dampening) spring (2 per

 

 

 

 

 

spring)

 

 

 

 

Inspect platform fold axles and bearings for wear or

Replace defective parts and resecure as needed.

 

 

damage and positive securement

Apply Light Oil.

 

 

 

 

 

 

Maintenance and Lubrication Schedule

 

Remove pump module cover and inspect:

Resecure, replace or correct as needed.

1500

Hydraulic hoses, fittings and connections for wear

 

 

or leaks

 

 

Cycles

Harness cables, wires, terminals and connections

 

 

 

for securement or damage

 

 

 

Control board, circuit breaker, power switch and

 

 

 

 

 

lights for securement or damage

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Perform all procedures listed in previous section also

 

 

 

 

Inspect cotter pins on platform pivot pin (2)

Resecure, replace or correct as needed

 

 

Hydraulic Fluid (Pump) - Check level. Note: Fluid

Use Dextron III transmission fluid. Check fluid

 

 

should be changed if there is visible contamination.

level with platform lowered fully and roll stop

 

 

Inspect the hydraulic system (cylinder, hoses, fit-

unfolded fully. Fill to within 1/2” of the bottom of

 

 

tings, seals, etc.) for leaks if fluid level is low.

the 1-1/2” fill tube (neck).

 

 

Inspect cylinders, fittings and hydraulic connections

Tighten, repair or replace if needed.

 

 

for wear, damage or leaks

 

 

 

 

Inspect parallel arms, bushings and pivot pins for

Replace if needed.

 

 

visible wear or damage

 

 

 

 

Inspect parallel arm pivot pin mounting bolts (8)

Tighten or replace if needed.

 

 

Inspect platform pivot pin, bushings and vertical

Replace defective parts and resecure as needed.

 

 

arms for wear, damage and positive securement

Apply Light Grease during reassembly procedures.

 

 

Inspect upper/lower fold arms, rotating pivot slide

Replace if needed.

4500

 

arms, slide support arms and associated pivot pins,

 

 

Cycles

 

bushings, and bearings for visible wear or damage

 

 

 

 

Inspect gas springs (cylinders) for wear or damage,

Tighten, replace or correct as needed

 

 

proper operation and positive securement

 

 

 

 

Inspect rotating pivot slide arm UHMW slide bear-

Apply Door-Ease or replace if needed. See Lubri-

 

 

ings (buttons)

cation Diagram.

 

 

Inspect vertical arm plastic covers

Resecure or replace if needed.

 

 

Inspect power cable

Resecure, repair or replace if needed.

 

 

Mounting

Check to see that the lift is securely anchored to

 

 

 

 

the vehicle and there are no loose bolts, broken

 

 

 

 

welds, or stress fractures.

 

 

Decals and Antiskid

Replace decals if worn, missing or illegible. Re-

 

 

 

 

place antiskid if worn or missing.

 

 

 

 

 

 

Consecutive

Repeat all previously listed inspection, lubrica-

750 Cycle

tion and maintenance procedures at 750 cycle

intervals.

Intervals

 

 

 

Image 8
Contents Position Lift DOT Private Use Lift Nhtsa Vehicle Physical RequirementsChassis Attach Power and Ground CablesSecure Lift Adjust Platform Angle Connect InterlocksLift Pump Module ShippedFollowing operations must be functionally verified Platform Floor Level AdjustmentPlatform Floor Level Position Adjustment Lift Operating Instructions To Open DoorsTo Unfold Platform Out To Unload PassengerManual Operating Instructions Maintenance and Lubrication Maintenance and Lubrication Schedule Lubrication Diagram750 LG Light GreaseMaintenance and Lubrication Schedule 15004500 Level with platform lowered fully and roll stop
Related manuals
Manual 8 pages 23.43 Kb Manual 8 pages 55.79 Kb