Braun 403 Maintenance and Lubrication Schedule Lubrication Diagram, 750, LG Light Grease

Page 7

Braun Corporation FMVSS No. 403 Quick Reference Installation Sheet 32494

Maintenance and Lubrication

Maintenance and Lubrication Schedule

 

Lubrication Diagram

Parallel Arm

Lift-Tite Latches

(Tower Pivot Points - 2)

Pivot Pins (8)

LO

LO

Lift-Tite Latch Dampening

 

Spring (2 springs - 4 Points)

 

LO

 

Parallel Arm

 

Pivot Pins (8)

 

LO

Proper maintenance is necessary to ensure safe, troublefree operation. Inspecting the lift for any wear, damage or other abnormal conditions should be a part of a regular service program. Simple inspections can detect potential problems.

The maintenance and lubrication procedures speci- fied in this schedule must be performed by a Braun authorized service representative at the scheduled intervals according to the number of cycles.

Braun dual parallel arm lifts are equipped with hard- ened pins and self-lubricating bushings to decrease wear, provide smooth operation and extend the service life of the lift.

When servicing the lift at the recommended inter-

intervals following the scheduled “4500 Cycles” maintenance. These intervals are a general guideline for scheduling maintenance procedures and will vary according to lift use and conditions. Lifts exposed to severe conditions (weather, envi- ronment, contamination, heavy usage, etc.) may require inspection and maintenance procedures to be performed more often than specified.

WARNING

Maintenance and lubrication procedures must be performed as specified by an autho- rized service techni- cian. Failure to do so may result in serious bodily injury and/or property damage.

Switch Arm Pivot Pins (2)

LO

vals, inspection and lubrication procedures specified in the previous sections should be repeated. Clean the components and the surrounding area before applying lubricants. LPS2 General Purpose Penetrating Oil is recommended where Light Oil is called out. Use of improper lubricants can attract

Maintenance Indicator: The Lift Ready green LED mounted on top of the pump cover will begin to blink after every 750 cycles. The blinking LED will not affect the functions of the lift, but is a reminder to complete necessary maintenance and lubrication.

UHMW Bearing (4)

DE

Rotating Pivot

Slide Arm Pivot Pins

LO

Inboard

Platform

Platform Fold Axles (2)

LO

Platform Pivot Pin (2 Points)

LO

Inboard Locator

Pivot Points

LO

Outer Platform Pivot Pins (2)

LO

Outer Barrier Activation

Foot Pivot Point (2)

LO

Outboard

Platform

dirt or other contaminants which could result in wear or damage to the components. Platform compo- nents exposed to contaminants when lowered to the ground may require extra attention.

Lift components requiring grease are lubricated dur- ing assembly procedures. When these components are replaced, grease must be applied during instal- lation procedures. Specified lubricants are available from The Braun Corporation (part numbers provided above).

All listed inspection, lubrication and maintenance procedures should be repeated at “750 cycle”

Once the lift has been serviced, fully stow the lift. Once stowed, press the UP button on the hand pendant and the Floor Level Set button on the back side of the pump cover until the Lift Ready green LED stops blinking.

Discontinue lift use immediately if maintenance and lubrication procedures are not properly performed, or if there is any sign of wear, damage or improper operation. Contact your sales representative or call The Braun Corporation at 1-800-THE LIFT. One of our national Product Support representatives will direct you to an authorized service technician who will inspect your lift.

Outer barrier hinge pivot points (2)

Apply Light Oil - See Lubrication Diagram

Platform Fold Link Roller/Pin (4)

LO

 

Outer Barrier

Outer Barrier Hinge Pivot Points

Arm Slots (2)

LO

(2) and

 

Outboard Platform Pivot Pins (2)

 

LO

 

See the Maintenance/Lubrication Schedule for recommended applications per number of cycles.

 

 

 

 

 

Specified (recommended)

Available

Braun

Lubricant

Type

Lubricant

Amount

Part No.

LO - Light Oil

Light Penetrating Oil

LPS2, General Purpose

11 oz.

15807

 

(30 weight or equivalent)

Penetrating Oil

Aerosol Can

 

DE - Door-Ease

Stainless Stick

Door-Ease

1.68 oz.

15806

 

Style (tube)

Stick (tube)

 

 

LG - Light Grease

Light Grease

Lubriplate

14 oz.

15805

 

(Multipurpose)

 

Can

 

 

Outer barrier arm slots (2)

Apply Light Oil - See Lubrication Diagram

 

Outboard platform pivot pins (2)

Apply Light Oil - See Lubrication Diagram

 

Outer barrier activation foot pivot pins (2)

Apply Light Oil - See Lubrication Diagram

750

Platform fold link rollers and pins (4 sets)

Apply Light Oil - See Lubrication Diagram

Outer platform pivot pins (2)

Apply Light Oil - See Lubrication Diagram

Cycles

 

 

 

Lift-Titelatches (tower pivot points - 2)

Apply Light Oil - See Lubrication Diagram

 

Lift-Titelatch gas (dampening) spring pivot

Apply Light Oil - See Lubrication Diagram

 

points (2 springs - 4 points)

 

 

Inspect Lift-Titelatches and gas springs for wear

Resecure, replace defective parts or otherwise

 

or damage (bent, deformed or misaligned), posi-

correct as needed. Note: Apply Light Grease to

 

tive securement (external snap rings) and proper

Lift-Titelatch tower pivot point if replacing latch.

 

operation

 

Image 7
Contents DOT Private Use Lift Nhtsa Vehicle Physical Requirements Position LiftSecure Lift Attach Power and Ground CablesChassis Shipped Adjust Platform AngleConnect Interlocks Lift Pump ModulePlatform Floor Level Position Adjustment Platform Floor Level AdjustmentFollowing operations must be functionally verified To Unload Passenger Lift Operating InstructionsTo Open Doors To Unfold Platform OutManual Operating Instructions LG Light Grease Maintenance and LubricationMaintenance and Lubrication Schedule Lubrication Diagram 750Level with platform lowered fully and roll stop Maintenance and Lubrication Schedule1500 4500
Related manuals
Manual 8 pages 23.43 Kb Manual 8 pages 55.79 Kb