Lucent Technologies LULCST manual

Page 13

4.Connect the detachable power supply cord between a 110/120 VAC outlet and the Call Stacker and verify the Power LED illuminates.

5.Turn the battery switch ON.

Installation 2-5

Image 13 Contents
Call Stacker Trademarks Contents This page intentionally left blank Overview Call Stacker Unit IntroductionBefore You Start System Connectivity Forward Station Grouping Disconnect Call Stacker Connectivity Chart Installation Wall Mounted Unit Installation StepsSET Switch Option Switch SettingOutput Channel Connection of Call Stacker Page This page intentionally left blank 6Installation Operation Rear Panel Description Operation Controls and IndicatorsRecording Announcements Voice Prompts EnabledAnnouncement Playback Voice Prompts DisabledSpecifications Maintenance TroubleshootingCall Stacker Unit Specifications