Paradyne 4000E installation instructions February IPD4-A2-GZ40-00

Page 14

4.Pull the hook-and-loop fastener strap upward, making sure that it is snug against the connector, then pull the strap back down, such that the hook-and-loop fastener layers stick to one another across the top of the connector.

5.Tuck the tab at the end of the strap down between the connector frames so that it is out of the way of other connections.

6.Screw the right side of the RJ21 cable connector into the jack screw on the right side of the RJ21 connector frame on the chassis. Note: If you are using a 120 or 180 degree cable, both the right and left sides of the cable connector should be screwed to the RJ21 connector frame on the chassis.

The LK (Link) LED for each port being connected with a remote modem will illuminate solid or flashing green to indicate a connection has been established. Link up time between interface modules and remote modems can vary from one to five minutes depending on the quality, gauge and distance of the copper cable pair(s) being used. Refer to individual interface module user guides for specific information such as connector pinouts, parameter configurations and distance capabilities.

14

February 2005

IPD4-A2-GZ40-00

Image 14
Contents Contents Software and Firmware License AgreementFebruary IPD4-A2-GZ40-00 Introduction Unpacking and Inspecting the EquipmentInstallation Options Installation on a TabletopQVWDOODWLRQLQD5DFN Installing Your Management Module Installing a Management ModuleInstalling Your Interface Modules $%&$ Powering Up Your 4000E BLC Positive Negative Power Lead Uplink Connections Subscriber Lines#21# February IPD4-A2-GZ40-00 Securing the Connecting Cables Configuration and Management# # Specifications Product Documentation OnlineImportant Safety Instructions United States EMI Notice Warranty, Sales, Service, and Training Information
Related manuals
Manual 20 pages 19.04 Kb