Paradyne 4000E installation instructions Uplink Connections, Subscriber Lines

Page 12

Uplink Connections

No configuration is necessary￿￿!￿￿+￿￿￿￿for!￿Uplink Interface Modules (UIMs) or Media Interface Modules (MIMs) installed on the management module in your 4000E to operate at default settings. However, if you wish to run your uplink connections at settings other than the UIM or MIM defaults, configure the UIM or MIM prior to making a connection.

For further connection and configuration information, refer to the installation instructions of your particular UIM or MIM model.

Subscriber Lines

No configuration is necessary for the interface module(s) installed in your 4000E to operate at default settings. However, if you wish to run your subscriber connections at settings other than the factory defaults, configure the interface module(s) prior to connection. Refer to the installation instructions for your particular interface module(s).

The 4000E chassis supports ADSL, IDSL, SDSL and T1/E1 technologies. Ensure that the subscriber lines you are connecting correspond with the technology of the interface module(s) installed in your 4000E.

Procedure

1.Identify the appropriate RJ21 Connector. Subscriber lines must be connected according to the 4000E slot in which the corresponding interface module was installed. Interface module slots 1–4 run from bottom to top; the corresponding RJ21 ports are directly behind each slot on the back of the chassis (1–4, bottom to top). Each interface module slot on the 4000E has two corresponding RJ21 connectors on the back of the chassis: the RJ21 connectors on the left (A) provide the subscriber connections for interface module ports 1–24 (on most models) and the RJ21 connectors on the right (B) provide the subscriber connections for interface module ports 25–48 (on applicable models). For the TIM1500-24 and EIM2000-24 interface modules,

12

February 2005

IPD4-A2-GZ40-00

Image 12 Contents
Contents Software and Firmware License AgreementFebruary IPD4-A2-GZ40-00 Introduction Unpacking and Inspecting the EquipmentInstallation Options Installation on a TabletopQVWDOODWLRQLQD5DFN Installing Your Management Module Installing a Management ModuleInstalling Your Interface Modules $%&$ Powering Up Your 4000E BLC Positive Negative Power Lead Uplink Connections Subscriber Lines#21# February IPD4-A2-GZ40-00 Securing the Connecting Cables Configuration and Management# # Specifications Product Documentation OnlineImportant Safety Instructions United States EMI Notice Warranty, Sales, Service, and Training Information
Related manuals
Manual 20 pages 19.04 Kb Manual 20 pages 48.14 Kb