Paradyne 4000E Securing the Connecting Cables, Configuration and Management

Page 15

Securing the Connecting Cables

Position all connecting cables such that they will not become a tripping hazard or pull loose from the chassis; secure with cable ties or hook-and-loop fastener straps.

Configuration and Management

Although no configuration is necessary to run subscriber lines at the default settings, all 4000E parameter settings are software selectable via Command Line Interface (CLI), Simple Network Management Protocol (SNMP), and/or the Network Management System (NMS). 4000E management capabilities depend upon the management module model installed in your chassis. Once the management module has been initialized, the interface modules installed in your 4000E may also be configured as desired. Refer to the following for further information:

Document

Contents

 

 

Management module

￿module installation

installation instructions

port pinouts

(model-specific)

parameter defaults

parameter configuration options

 

 

management system capabilities

 

 

Uplink module installation

￿module installation

instructions

port pinouts

(model-specific)

parameter defaults

parameter configuration options

 

 

 

Interface module user

￿module installation

guides

distance and bandwidth capabilities

(model-specific)

port pinouts

parameter defaults

 

 

parameter configuration options

 

 

CLI Management User

￿management module initialization instructions

Guide

command user guide

 

command definitions

 

configuration options common to all management

 

module models

 

configuration options common to all interface module

 

models

 

 

NMS Management User

￿management module initialization instructions

Guide

screen by screen user guide

 

parameter definitions

 

configuration options common to all management

 

module models

 

configuration options common to all interface module

 

models

 

 

IPD4-A2-GZ40-00

February 2005

15

Image 15
Contents Software and Firmware License Agreement ContentsFebruary IPD4-A2-GZ40-00 Unpacking and Inspecting the Equipment IntroductionInstallation on a Tabletop Installation OptionsQVWDOODWLRQLQD5DFN Installing a Management Module Installing Your Management ModuleInstalling Your Interface Modules $%&$ Powering Up Your 4000E BLC Positive Negative Power Lead Subscriber Lines Uplink Connections#21# February IPD4-A2-GZ40-00 Configuration and Management Securing the Connecting Cables# # Product Documentation Online SpecificationsImportant Safety Instructions United States EMI Notice Warranty, Sales, Service, and Training Information
Related manuals
Manual 20 pages 19.04 Kb